Environmental projects references[316kB ]
MUNICIPAL AND INDUSTRIAL WASTE WATER TREATMENT PLANTS
Investor | Location | Project | Year |
STEKLARNA ROGAŠKA | Rogaška Slatina | Industrial Waste Water Treatment Plant for waste water from glass cutting workshop | 1993 |
GEOPROJEKT LJUBLJANA | Gaberke | Gaberke pumping station | 1998 |
VODOVOD KANALIZACIJA LJUBLJANA | Ljubljana | Reconstruction of electrical equipment at sewage pumping stations | 2000 |
NIKO | Železniki | Industrial Waste Water Treatment Plant for waste water from galvanization process | 2001 |
ACRONI | Jesenice | Industrial Waste Water Treatment Plant | 2002 |
ELEKTROSIGNAL | Celje | Electrical installations at the Celje municipal waste water treatment plant | 2002 |
PREMOGOVNIK VELENJE | Velenje | Elaboration of a study for Industrial Waste Water Treatment Technology | 2002 |
OBČINA ŠMARTNO OB PAKI | Šmartno ob Paki | Municipal Waste Water Treatment Plant -4.500 EI, I. phase | 2002-2003 |
ZAVOD PROJEKT ATOL | Ljubljana | Small Waste Water Treatment Plant for research station Makrolab | 2003 |
VODOVOD KANALIZACIJA LJUBLJANA | Ljubljana | Waste water pumping station - modernization of the electrical equipment | 2003-2004 |
KOMUNALNO PODJETJE VELENJE | Velenje | Pilot Device for Sludge stabilization | 2004 |
COMET | Zreče | Study for Waste Water Treatment | 2005 |
ACRONI | Jesenice | Reduction of cooling water consumption -cleaning | 2004-2005 |
JAVOR PIVKA | Pivka | Industrial Waste Water Treatment Plant | 2005-2006 |
ACRONI | Jesenice | Treatment of neutralisation sludge | 2005-2006 |
ACRONI | Jesenice | Waste water neutralisation from lixivium lines | 2005-2006 |
METAL RAVNE | Ravne na Koroškem | Industrial Waste Water Treatment Plant | 2006 |
ACRONI | Jesenice | Industrial Waste Water Treatment Plant | 2006-2007 |
DROGA KOLINSKA | Rogaška Slatina | Industrial Waste Water Treatment Plant | 2006-2007 |
ACRONI | Jesenice | Sludge treatment | 2007 |
ACRONI | Jesenice | Executing of construction works, supply and installation on project "Cooling water supply" | 2008-2009 |
ELEKTROPRIVREDA REPUBLIKE SRBSKE | Ugljevik, BIH | Reconstruction of waste water system in the TE and mine Ugljevik including municipal waste water treatment plant (450, 750,1500 PE) | 2010-2012 |
KOMUNALNO PODJETJE | Velenje | Annual electrical manintenance on the water treatment plant | 2011 |
OBČINA DOMŽALE, KAMNIK, MENGEŠ | Domžale | Central Waste water treatment plant Domžale-Kamnik, maintenance work | 2011 |
OBČINA MOZIRJE | Mozirje | Implementation works on the treatment plant PE 6000 | 2015-2016 |
OBČINA JESENICE | Jesenice | Sewer construction works, reconstruction and upgrade of central waste water treatment plant at municipality Jesenice- construction of tertiary Jesenice 30000 PE | 2013-2015 |
OBČINA ILIRSKA BISTRICA | Ilirska Bistrica | Receiving a cesspool of sewage - Technology | 2014 |
OBČINA ŠMARJE PRI JELŠAH | Šmarje pri Jelšah | Sewage treatment plant Mestinje 1950 PE | 2014 - 2015 |
DELEGATION OF THE EUROPEAN UNION TO THE REPUBLIC OF SERBIA | Obrenovac, SRB | EU - Construcion and commissioning of the new WWTP at TPP Nikola Tesla A | 2014 - 2016 |
ELECTRIC POWER INDUSTRY OF SERBIA | Obrenovac, SRB | Construction of oily waste water treatment plant at TENT A | 2016-2017 |
HENKEL MARIBOR | Maribor | New pretreatment Inudustrial Waste Water Treatment Plant | 2016-2017 |
KOMUNALA NOVO MESTO | Dolenjske Toplice | Pilot Tests, optimization WWTP | 2017 |
TE PLOMIN | Plomin, HRV | Reconstruction of the lamella clarifier | 2017 |
ELEKTROPRIVREDA REPUBLIKE SRPSKE | Ugljevik, BIH | Procurement of services of maintenance (repair) and improvement of the industrial WTP (Ugljevik) | 2017 |
VO-KA CELJE | Škofja vas | Wastewater treatment plant Škofja vas - reconstruction of mechanical pre-treatment | 2017-2018 |
KOMUNALA TOLMIN | Tolmin | Reconstruction of WWTP Volče | 2017-2018 |
UTILITIY COMPANY ZHYTOMYRVODOKANAL | Zhytomyr, UKR | Reconstruction of WWTP Zhytomyr, Including Replacement Of Mechanical And Electrical Equipment And Sewer Pipes | 2018-2021 |
OBČINA DOLENJSKE TOPLICE | Dolenjske Toplice | Municipal waste water treatment plant | 2018-2019 |
HENKEL MARIBOR | Maribor | Automatic dosing of lime suspension in industrial waste water treatment plant Henkel | 2019 |
VARKOM VARAŽDIN | Varaždin, HRV | Construction of wastewater treatment plant Varaždinske toplice | 2019-2022 |
JP ELEKTROPRIVREDA SRBIJE | Beograd, SRB | Annual maintenance of the TENT-A wastewater management system | 2019 |
OBČINA MOZIRJE | Mozirje | Wastewater treatment plant Mozirje - Phase 2, digester | 2021 |
PRIMOŠTEN ODVODNJA | Primošten, HRV | Construction of the drainage and wastewater treatment system of the settlement of Primošten - Phase I A - WWTP Primošten 18.750 PE | 2020-2022 |
KOMRAD SLATINA | Slatina, HRV | Construction of WWTP for agglomeration Slatina (FIDIC Yellow) and access infrastructure 16.000 PE | 2020-2023 |
WATER CONDITIONING
Investor | Location | Project | Year |
TERMOELEKTRARNA BRESTANICA | Brestanica | Chemical Process Water Conditioning Facility | 1999-2000 |
MELAMIN | Kočevje | Closed cooling system | 2001 |
CINKARNA CELJE | Celje | Process Water Conditioning Facility | 2002 |
CINKARNA CELJE | Celje | Reconstruction of a cooling tower EWB 7200/09 | 2002 |
GORENJE | Velenje | Transport and storage of PUR components | 2000-2001 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Reconstruction of Chemical Process Water Conditioning Facility | 2002 |
ACRONI | Jesenice | Reduction of cooling water consumption -chemical and termical preparation | 2004-2005 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | System for preparation and dosage of lime milk | 2004 |
CINKARNA CELJE | Celje | Water treatment | 2005-2006 |
ENERGETIKA MARIBOR | Maribor | Water treatment | 2008 |
JAVNO PODJETJE TOLOTNA OSKRBA | Maribor | Reconstruction works of chemical water treatment plant | 2008-.2009 |
VODOVOD – KANALIZACIJA | Frankolovo | Replacement facility for drinking water production, Waterworks Frankolovo | 2010 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Water treatment | 2012-2015 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Ammonia water - unit 6 | 2012-2015 |
DRAVSKE ELEKTRARNE MARIBOR | Mariborski otok | Reconstruction of technological sanitary plumbing on HE MO | 2014 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Ammonia water - unit 6 | 2012-2015 |
PETROL ENERGETIKA | Štore | Reconstruction on the SIIla pumping station | 2017 |
PREPARING DRINKING WATER
Investor | Location | Project | Year |
VODOVOD – KANALIZACIJA | Frankolovo | Replacement facility for drinking water production, Waterworks Frankolovo | 2010 |
MESTNA OBČINA VELENJE | Velenje | Complete drinking water supply in Šaleška valley | 2012-2015 |
OBČINA MAKOLE | Makole | Drinking water supply in the basin of river Savinja, Set 3 | 2013-2015 |
OBČINA GRAD | Pomurje | Drinking water supply in Pomurje region,system B -Set 3 | 2013-2014 |
OBČINA ŠENTJUR | Šentjur | Drinking water supply in the basin of river Sotla and implementation of drinking water pipeline in the Šentjur municipality | 2014-2015 |
INFRA | Krško | The pumping station in the area of the old part of Krk on Dalmatinova street | 2014-2015 |
OBČINA LJUTOMER | Ljutomer | Drinking water supply in Pomurje - System C - Lot 2 | 2014-2015 |
MESTNA OBČINA VELENJE | Vinska gora | Water Supply System Vinska Gora – section 5 and 8 | 2015 |
MESTNA OBČINA NOVO MESTO | Novo mesto | Construction of Water treatment Plant, Hydraulic improvement of potable water supply system in central Dolenjska | 2015-2016 |
OBČINA KANAL OB SOČI | Deskle | Facilities for drinking water preparation Deskle | 2016 |
KOMRAD Hrvaška | Vo?in - Sobunar, HRV | Facilities for drinking water production - water pumping station "Vo?in - Sobunar" | 2016-2018 |
OBČINA KANAL OB SOČI | Avče | Water filtration Avče | 2017 |
OBČINA KANAL OB SOČI | Ložice | Facilities for drinking water preparation Ložice | 2017 |
OBČINA KANAL OB SOČI | Ročinj | Facilities for drinking water preparation Ročinj | 2018 |
MUNICIPALITY OF NEVESINJE | Nevesinje, BIH | Rehabilitation of Alagovac Water Treatment Plant, Nevesinje | 2018-2021 |
OBČINA KANAL OB SOČI | Kambreško | Facilities for drinking water preparation Kambreško | 2019 |
MINISTERSTVO ZA ZEMLJODELSTVO, ŠUMARSTVO I VODOSTOPANSTVO | Republika Severna Makedonija, MKD | Civil works on water treatment plant Karbinci | 2020-2021 |
OP?INA ORAŠJE | Orašje, BIH | Design and construction of water treatment plant Orašje | 2020-2021 |
KOLEKTOR SISTEH | Republika Severna Makedonija, MKD | Supply of equipment for WTP Štip | 2020 |
KOMUNALA NOVO MESTO | Novo mesto | Service and equipment to ensure the safe and uninterrupted operation of the Jezero and Stopiče WTPs | 2020 |
FLUE GAS DESULPHURIZATION
Investor | Location | Project | Year |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Additive desulphurization of flue gases at all of the five units | 1991-1994 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Electrical and mechanical equipment at the desulphurization plant for the unit No. 4 | 1993-1995 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Dump for the flue gas desulphurization by-products | 1994 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Pumping station for moistening by-products, desulphurization at the by-product dump | 1994 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Power supply for stack emmision measuring equipment at the unit 4 and 5 stacks | 1994 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of mechanical equipment for flue gas desulphurization at unit no. 4 | 1995 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Refit of the flue gas desulphurization plant for unit 4; replacement of the spraying pipelines; instalation of sieves on the suction side of the existing pumps | 1996-1998 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Flue gas desulphurization plant for unit 5 | 1999-2000 |
MPI RECIKLAŽA | Žerjav | Desulphurization of flue gases from metalurgical treatment of secondary lead | 1998-2000 |
TERMOELEKTRARNA TRBOVLJE | Trbovlje | Flue gas desulphurisation - Basic design | 2001 |
MPI RECIKLAŽA | Žerjav | Reconstruction of the desulphurization plant | 2005-2006 |
TERMOELEKTRARNA TRBOVLJE | Trbovlje | Flue gas desulphurisation - Project for building permit | 2005 |
ELEKTROPRIVREDA BIH | Tuzla, BIH | Flue gas desulphurisation - Basic design | 2004-2005 |
MPI RECIKLAŽA | Žerjav | Flue gas desulphurisation- renovation system | 2009 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Flue gas desulphurisation- Unit 6 | 2009 |
MPI RECIKLAŽA | Žerjav | Updated process flue gas from the frunace drum | 2009 |
MPI RECIKLAŽA | Žerjav | Process update of the flue gases from drum furnace. Reconstruction works between drum furarnaces and bag filter | 2009 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Flue gas duct recovery, recirculation of fue gases and fresh air - TPP Šoštanj | 2011 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Flue gas duct recovery | 2013 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Designing, manufacturing and implementation of flue gas desulphurisation device at unit 6 (power 600 MW TPP Šoštanj) | 2011-2015 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Overhaul works on FGD Unit 6 | 2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintanance work on FGD Unit 6 | 2020 |
THERMAL PROCESSING OF WASTES
Investor | Location | Project | Year |
ESOTECH & INSTITUT JOŽEF STEFAN | Podgorica pri Ljubljani | Demonstration facility for thermic waste treatment | 2000-2002 |
VIPAP VIDEM KRŠKO | Krško | Incineration on boiler K5 - Basic design | 2000 |
ADRIA MOBIL | Novo Mesto | Test incineration of waste in a pilot facility for thermic waste treatment | 2002 |
MPI RECIKLAŽA | Žerjav | Test incineration of waste in a pilot facility for thermic waste treatment | 2005 |
PALOMA | Sladki Vrh | Paper industry - waste processing | 2006 |
KOTO | Ljubljana | Designing and implementation of technological equipment for biogas power station | 2007-2008 |
JAVNA AGENCIJA ZA TEHNOLOŠKI RAZVOJ RS | Ljubljana | Technology development for biogas production from communal waste and industry waste | 2009 |
KOTO | Ljubljana | Upgrade of biogas power station KOTO | 2010 |
DUST REMOVAL - ASPIRATION
Investor | Location | Project | Year |
LIVARNA | Berlin, DEU | Foundry - dust removal system | 1987 |
LESNA | Slovenj Gradec | Flue gas filtration | 2000 |
KOTO | Ljubljana | Mechanical and electrical installations for ventilation | 2002-2006 |
ACRONI | Jesenice | Reconstruction of a dust removal installation EOP - phase 1 | 2002 |
ACRONI | Jesenice | Revamping of drying and heation points | 2003 |
ACRONI | Jesenice | Reconstruction and construction works on mod-ernization of VOD device | 2004 |
ACRONI | Jesenice | Supply and erection works, mechanical and electrical for expansion of cooling system of VOD 1 device | 2004 |
ŠTORE STEEL | Štore | Modernizaton of heating points | 2006 |
LUKA KOPER | Koper | Reconstruction of wagon station for bulk cargo - dust removal | 2006 |
W&P PROFIL | Ruše | Equipment installation for crusginh and sieving silicon alloys | 2007 - 2008 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Manufacturing and equipment installation for recirculation on unit 5 (TPP Šoštanj) | 2007 |
MPI-RECIKLAŽA | Žerjav | Flue gas ducts from bag filter to flue gas fan in RDP device | 2010 |
| | | |
ACRONI | Jesenice | Manufacture of the ventilation system | 2011 |
ACRONI | Jesenice | AOD converter | 2016-2017 |
TRANSPORT EQUIPMENT
Investor | Location | Project | Year |
LUKA KOPER | Koper | Bulk cargo, dry bulk cargo, Belinka borates unloading terminal and dry bulk cargo loading terminal | 1985-1995 |
LUKA KOPER | Koper | Automation of technological drives in the extended halls TH1 and TH2 | 1986 |
PREMOGOVNIK VELENJE | Velenje | Upgrade of the plant for the operative preparation of the electrostatic precipitator ashes | 1996-1998 |
GLIN NAZARJE | Nazarje | Conveying and screening equipment | 1999 |
PREMOGOVNIK VELENJE | Velenje | Conveyors - 50 C in 71 | 1999 |
PREMOGOVNIK VELENJE | Velenje | Reconstruction of connections for the pneumatic transport of EP ashes from unit 5 of the Thermal Power Plant Šoštanj to the silos S 2, S 3 and S 4 | 1997-1998 |
LUKA KOPER | Koper | Mobile transporter with a screening unit, capacity of 300 t/h | 1999 |
TOVARNA SLADKORJA ORMOŽ | Ormož | System for loading of sugar into road tankers | 2001 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Transport of slag and ash at Unit 5 | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Supply of steel conveyor | 2002-2004 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Year refit works on ash transport of unit 4 and 5 | 2004 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Transport of slag and ash at Unit 4 | 2004 |
TERMOELEKTRARNA TOPLARNA LJUBLJANA | Ljubljana | Moisturing of system for re-pouring on coal transport | 2005-2006 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Link conveyor | 2005 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Rubber conveyor for gypsum in mixing station of unit 5 | 2005 |
LUKA KOPER | Koper | Reconstruction of wagon station for bulk cargo | 2006 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintanance works on ash transportation unit 5 (TPP Velenje ) | 2006 -2007 |
TERMOELEKTRARNA TUZLA | Tuzla, BIH | Reconstruction works on slag transportation for unit 5 | 2006 - 2007 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Slag transportation on unit 5 for truck loading | 2008 |
TE TOL | Ljubljana | Assembly of electricity equipment for biomass transportation system | 2008 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Slag redirecting to the hydraulic transport | 2008 |
ELEKTROPRIVREDA BiH | Tuzla, BIH | Reconstruction works on slag transportation for unit 4 (TPP Tuzla) | 2009 |
RUDNIK UGLJA A.D. PLJEVLJA | Pljevlja, MNE | Reconfiguration and modernization of the DTO system – Phase I. | 2018 |
Power technologies projects references[420kB ]
TRANSMISSION AND DISTRIBUTION OF ELECTRICAL ENERGY (TRANSFORMER STATIONS)
Investor | Location | Project | Year |
LUKA KOPER | Koper | Unloading terminals for bulk cargo, dry bulk cargo, Belinka borates, loading terminal for dry bulk cargo; automation of technological drives in the extended halls TH 1 and TH 2 | 1987 |
PREMOGOVNIK VELENJE | Velenje | Transformer station 35 kV/0,4 kV - supply and installation of the new equipment | 1995 |
PLASTIKA SKAZA | Velenje | Erection of TS Selo - Skaza | 1997 |
LUKA KOPER | Koper | TS 4-bulk cargo terminal | 1999 |
GORENJE | Bistrica ob Sotli | Transformer station 20/0,4 kV - 630 kVA with the connection cable line | 1997 |
GORENJE | Velenje | Reconstruction of the transformer station | 1998 |
GORENJE | Velenje | Reconstruction of the power supply system 20/0,4 kV - RP 1, TP 3, TP 13 | 1998 |
GORENJE | Velenje | Construction of a new and reconstruction of an old transformer station Galvana Gorenje, d.d.; TS 3 x 1000 kVA as well as svvitching station 20 kV with connection cable lines | 1999 |
GORENJE | Velenje | Transformer station tool shop | 1999 |
PREMOGOVNIK VELENJE | Velenje | Transformer station 35 kV/0,4 kV | 1995 |
LUKA KOPER | Koper | Transformer station | 2000 |
LUKA KOPER | Koper | Transformer station for bulk cargo | 2000 |
LUKA KOPER | Koper | Transformer station 23 | 2000 |
GORENMJE NOTRANJA OPREMA | Gorenja vas | Extension of the transformer station | 2001 |
LUKA KOPER | Koper | Transformer station - bulk cargo terminal 1 | 2001 |
STEKLARNA ROGAŠKA | Rogaška Slatina | Reconstruction of the transformer station TS 20/0,4 kV | 2001 |
GORENJE | Velenje | Transformer station TS Galvana 20/0,4 kV | 2001 |
GORENJE | Velenje | Reconstruction of the transformer station TS-1 | 2001 |
GORENJE | Velenje | Transformer station TS 7 - administration building | 2002 |
GORENJE | Velenje | Transformer station TS 6 - stoves | 2002 |
TURBOINŠTITUT | Ljubljana | Replacement of the medium voltage equipment in a transformer station | 2002 |
LUKA KOPER | Koper | Replacement of the medium and low voltage svvitching unit in the Container terminal transformer station | 2002 |
KLINIČNI CENTER | Ljubljana | Transformer station | 2002 |
GORENJE IPC | Velenje | Transformer station; new polistyrene packaging production plant | 2002 |
STEKLARNA ROGAŠKA | Rogaška Slatina | TS Talilnica transformer station | 2002 |
LUKA KOPER | Koper | Replacement of the medium and low voltage svvitching unit in the TS 2 - bulk cargo terminal | 2002 |
VIPAP VIDEM KRŠKO | Krško | Supply and installation of equipment for the paper machine PS 2 transformer station | 2002 |
GORENJE | Šoštanj | Transformer station TS Gorenje-Šoštanj | 2004 |
ISKRA INVEST | Kranj | Reconstruction of TS 2 in industrial zone Iskra Labore | 2004 |
ISKRA INVEST | Kranj | Supply and installation of 20 kV cable in industrial zone Iskara Labore | 2004 |
GORENJE | Velenje | Expansion of transformer station TS 3 Energetika | 2004 |
LUKA KOPER | Koper | Renevral of low voltage svvitching unit in TS 20 vrarehouse | 2004 |
ACRONI | Jesenice | Reconstruction of transformer stations TS 2 and TS3 Javornik - New line for heat treatment of thick metal plates | 2004-2005 |
ELEKTRO CELJE | Celje | 20 kV cable line modification | 2005 |
ISKRA INVEST | Kranj | Installation of 20 kV equipment in TS 1, TS 3 and reassembling of equipment in TS2 | 2005 |
LUKA KOPER | Koper | Renevral of low voltage svvitching unit GRG I and GRG II | 2005 |
ACRONI | Jesenice | Supplv and installation of 35 kV cable between distribution transformer station Stili mili and DTS Bela | 2005 |
SIEMENS | Jesenice | Reconstruction of TS 4 Stili mili | 2005 |
ELEKTRO CELJE | Velenje | Reconstruction of TS ESO | 2005 |
ACRONI | Jesenice | Erection of TS Ponovčna peč | 2006 |
ACRONI | Jesenice | Delivery and installation of two new transformers and Low voltage unit in DTS Bela | 2006 |
KOTO | Ljubljana | Transformer station TS Koto | 2006 |
KLINIČNI CENTER LJUBLJANA | | Renovation works on the main distribution panel in transformer station | 2007 |
ACRONI | Jesenice | Transformer station | 2006-2007 |
ZZZS | Ljubljana | Transformer station | 2007-2008 |
METAL RAVNE | Ravne na Koroškem | Transformer station | 2007-2008 |
LUKA KOPER | Sežana | Electrical installation in Transformer station | 2007 - 2009 |
GORENJE | Velenje | TS line KA | 2008 |
ELEKTRO CELJE | Mozirje | Electrical cabinet fabrication for protection of 110kV transformer station on switchyard Mozirje | 2008 |
ACRONI | Jesenice | Designing, assembly of transformer starions TS3, TS4,TS žarilna and DTS Javornik | 2008 |
VO-KA | Ljubljana | Reconstruction of transformer station Vodarna Hrastje | 2008 - 2009 |
ELEKTRO UNIMONT | Rogla | Transformer station on cross country ski center Rogla | 2010 |
MESTNA OBČINA LJUBLJANA | Ljubljana | Delivery and assembly disel generator | 2010 |
ELEKTRO CELJE | Štore | Cable ducts for distribution transformer station Štore and Lipa , - 3rf phase | 2010 |
RADEČE PAPIR | Radeče | Recovery works on transformer station Radeče | 2010-2011 |
METAL RAVNE | Ravne na Koroškem | Transformer station Implement Metal nova jeklarna | 2011 |
METAL RAVNE | Ravne na Koroškem | Transformer station Implement EPŽ III | 2011 |
RADIOTELEVIZIJA SLOVENIJA | Krvavec, Trdinov vrh | Electricity generator for OC Krvavec and AOC Trdinov vrh | 2011 |
ACRONI | Jesenice | Manufacturing, delivery and assembly of transformer station for new BLOOMING | 2011 |
DARS | Po Sloveniji | Annual maintenance and inspection on medium voltage devices in DARS managing | 2011 |
RUDIS | Trbovlje | Transformer station 20/0,4kV SPTE - Planina | 2011 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Electricity power supply at construction site of unit 6 TPP Šoštanj | 2011-2012 |
PETROL ENERGETIKA | Štore | 4th phase of cable ducts LIPA - ŠTORE | 2011-2012 |
PETROL ENERGETIKA | Štore | Energy coridor implement | 2011-2012 |
ALSTOM | Šoštanj | Electricity power supply for container village | 2012 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Temporay electricity power supply for construction site | 2012 |
METAL RAVNE | Ravne | Reconstruction works of medium voltage switchgear in transformer station | 2012 |
METAL RAVNE | Ravne | Delivery and assembly of low voltage block for transformer station - čistilnica | 2012 |
ACRONI | Jesenice | Reconstruction works on transformer station 3 - Javornik | 2012 |
SENG | Nova gorica | Transformer station 10kV Doblar | 2013 |
PETROL ENERGETIKA | Štore | Transformer station 5/0,4kV Ban Lubbe | 2013 |
ACRONI | Jesenice | Transformer station 10kV Doblar | 2013 |
GORENJE | Velenje | Reconstruction of TP 8 HZA | 2013 |
TEŠ | Velenje | Transformer station TP RDP 5/0,4kV | 2013 |
METAL RAVNE | Ravne | The construction of transformer substations TP Nova Jeklarna 20/0,4 kV | 2014 |
PETROL ENERGETIKA | Štore | Reconstruction of TP 5/0.4 kV Power plant, 1.phase | 2014 |
MO VELENJE | Velenje | Transformer station TP Grmov vrh 20/0,4kV | 2015 |
ELEKTRO CELJE | Vuzenica, Dravograd | Installation resonant chokes in Vuzenica 110/20 kV substation and the 110/20 kV Dravograd | 2014 |
ELEKTRO GORENJSKA | Železniki | Supply and installation of 110 kV cable line 110 + 20 kV Železniki-Bohinj | 2014-2015 |
GORENJE | Velenje | Reconstruction of TP-PS2 | 2015 |
MO NOVO MESTO | Novo Mesto | Reconstruction of TP jezero | 2015 |
METAL RAVNE | Ravne | Reconstruction of TP UHP | 2015-2016 |
ACRONI | Jesenice | Transformer station 5/0,4kV TP WTP | 2016 |
ACRONI | Jesenice | Transformer station 5/0,4kV TP LTO | 2016 |
PETROL ENERGETIKA | Štore | Reconstruction of CTP 35/ kV, 3.phase | 2016 |
PREMOGOVNIK VELENJE | Velenje | Supply, assembly and commissioning of remote control in DTS Nove Preloge | 2016-2017 |
PETROL ENERGETIKA | Štore | Supply, assembly equipment - central TS | 2017 |
C&G | Talum Kidričevo | TSS Rondelice 10-0,4 kV | 2017 |
GORENJE | Limbuš | Reconstruction and upgrade of TS 4 | 2017 |
KOVIS-LIVARNA | Štore | Delivery and installation transformer station for project “TS KOVIS” | 2018 |
PETROL LJUBLJANA | Štore | Increase of portable power distribution transformer station Lipa – central transformer station and central transformer station | 2018 |
IMPOL | Štore | Transition from 6 kV to 20 kV power supply | 2019 |
ELEKTRO PRIMORSKA | Lucija | Reconstruction of transformer station TR 1 - DTS Lucija 110/20 kV | 2019 |
ELEKTRO CELJE | Trnovlje | Electrical installation works of DTS Trnovlje | 2020 |
SIJ ACRONI | Jesenice | MV block upgrade | 2020 |
SIJ METAL RAVNE | Ravne | TS New steel mill III | 2021 |
TRANSMISSION AND DISTRIBUTION OF ELECTRICAL ENERGY (SWITCHYARDS)
Investor | Location | Project | Year |
ELES | Cirkovce | Replacement of high voltage equipment at the 100 kV fields Maribor I. and II. | 1998 |
ELES | Maribor | Replacement of high voltage equipment for the 400 kV transmission line Podlog the binding field; reshaping of the 110 kV switching station of the transmission lines Sladki vrh and Melje I. and II. | 1999 |
ELES | Ljubljana | Replacement of high voltage equipment at 110 kV, 220 kV and 400 kV svvitching stations | 1999 |
SAVSKE ELEKTRARNE LJUBLJANA | Mavčiče | Replacement of breakers 123 kV, 2000 A, 6000 MVA (31,5 kA) with electric motor drive | 1997 |
ELES | Cirkovce | Distribution transformer station Cirkovce | 1998 |
TERMOELEKTRARNA TOPLARNA LJUBLJANA | Ljubljana | Reconstruction and extension of the 110 kV switchyard station | 1999 |
ELES | Podlog | Distribution transformer station Podlog | 2000 |
ŽITO | Ljubljana | Reconstruction of the transformer station and data transfer project | 2000 |
ELEKTRO CELJE | Laško | Installation of the 110 kV equipment in the distribution transformer station 110/20 kV Laško | 2001 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Installation of equipment at a 400 kV switching station | 2001 |
ELEKTRO GORENJSKA | Labore | Construction of the 110 kV svvitching station at the distribution transformer station 110/20/10 kV Labore | 2001 |
ELES | Divača | Electrical installation works during the installation of high voltage and secondary equipment at the distribution transformer station Divača | 2001 |
ELES | Krško | Electrical installation works - installation of the secondary equipment at the distribution transformer station Krško | 2002 |
PREMOGOVNIK VELENJE | Velenje | Reconstruction of the power supply | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Reconstruction of the 220 kV switching station | 2002 |
ELEKTRO CELJE | Laško | Installation of the 20 kV equipment at the 110/20 kV distribution transformer station Laško | 2002 |
ELEKTRO CELJE | Laško | Production and installation of secondarv equip-ment for the 110/20 kV distribution transformer station Laško | 2002 |
ELEKTRO CELJE | Laško | Connection of the new Elektro Celje's 110/20 kV distribution transformer station Laško to the existing ELES collectors of distribution transformer stations 110/35 kV | 2002 |
VIPAP VIDEM KRŠKO | Krško | Supply and installation of the equipment for the PS 2 transformer station | 2003 |
TERMOELEKTRARNA TOPLARNA LJUBLJANA | Ljubljana | Reconstruction of the 6 kV units 2BBa and BCA | 2003 |
ELES | Krško | Reconstruction of the 400/110 kV transformer station | 2003 |
ACRONI | Jesenice | Replacement of 35 kV svvitching station in DTS Bela | 2003-2004 |
SPG SOL PLIN GORENJSKA | Jesenice | Supplv and installation of equipment for the DTS Kisikarna | 2004 |
ELES | Kidričevo | Building and reconstruction of 400/220/110 kV Kidričevo transformer stations | 2003-2005 |
ACRONI | Jesenice | Designing, manufacturing, delivery and erection of equipment for construction of 5 kV swtchyard in engine room of Blooming - rooling mill | 2004 |
ACRONI | Jesenice | Execution of 35 kV cable connection DTS Bela - DTS Javornik - New line for termichal handling of thick steel plates | 2004-2005 |
ACRONI | Jesenice | Supply and installation of equipment for distribution station DT HVB - 5 kV switchyard | 2004-2005 |
SPG SOL PLIN GORENJSKA | Jesenice | Verification of installations and documentation for DTS Kisikarna | 2005 |
ACRONI | Jesenice | Reconstruction of 110 kV switchyard DTS Steel mili | 2005-2006 |
C&G LJUBLJANA | Koper | Supply and erection of free-air High Voltage eguipment in DTS Koper | 2005 |
MARC GRADBENO PODJETJE | Nova Gorica | Adaptation of rooms DCV in DTS 110/20/10 kV Gorica | 2005-2006 |
ELES | Maribor | Electro mounting works for DTS Maribor | 2006 |
ELEKTRO PRIMORSKA | Koper | Supply and erection of own use for DTS 110/20 kV Lucija | 2006 |
ACRONI | Jesenice | Switchyard reconstruction | 2006-2007 |
ELEKTRO LJUBLJANA | Ljubljana | Switchyard reconstruction | 2006-2007 |
ELES | Ljubljana | Switchyard reconstruction | 2006-2007 |
ELES | Maribor | Electrical works on distribution transformer station Maribor and relocation and replacement of 400kV disconnectors | 2007 |
ELES | Cirkovce | Replacement high voltage equipment on DTS 220/110kV | 2007 |
SIEMENS | Mačkovci | Equipment delivery for 110kW GIS with connectors for DTS Mačkovci | 2007 - 2008 |
ELES | Pekre | Electrical works on distribution transformer station Pekre | 2007 - 2008 |
ACRONI | Jesenice | Reconstruction of 110 kV switchyard DTS Steel mill 2nd phase. | 2007-2008 |
ELES | Podlog | Electrical works and erection works at the reconstruction of 400kV switchyard in DTS Podlog | 2008 |
ELEKTRONABAVA | Dravograd | Equipment Assembly of 110kV GIS in DTS Dravograd | 2008 - 2009 |
ELES | Maribor | Electrical works restoration of switchyard Maribor -3rd. phase | 2009 |
ELEKTRO LJUBLJANA | Ljubljana | Electricity works in DTS 110/20kV - Litostroj | 2008-2010 |
ELEKTRO CELJE | Brestanica | Manufacturing and delivery protection cabinets for DTS Brestanica | 2009 |
ELEKTRO PRIMORSKA | Vrtojba | Equipment delivery and assembly at the replacement of transformer station in DTS, Vrtojba | 2010 |
ELES | Laško | 110/20 kV Laško - secondary equipment | 2009-2010 |
DRAVSKE ELEKTRARNE | Dravograd | Euipment disassembly and assembly of 110kV | 2010 |
ELES | Krško | Electrical works at DTS 400/110kV-Krško switchyard upgrading | 2010-2012 |
ACRONI | Jesenice | Supply of 35kV conduit for DTS- Jeklarna | 2011 |
ELEKTRO CELJE | Slovenj Gradec | Cabinets manufacturing of AC/D outlet of 110/20kV in Slovenj Gradec. | 2011 |
ELEKTRO CELJE | Celje | Cabinet for protection managing, cabinets for voltage measuring for DTS Lava, transformer station 1 | 2011 |
ELEKTRO CELJE | Rogaška Slatina | DTS 110/20kV ,cabinet for protection managing | 2011 |
ELEKTRO CELJE | Velenje | Cabinet for protection managing, cabinets for voltage measuring for DTS Velenje | 2012 |
ELES | Ilirska Bistrica | Electrical works, transformer station relocation, cells upgrading and testing in DTS 110/kV Ilirska Bistrica | 2012-2013 |
SIEMENS | Gorica | Equipment deassembly and assembly on 110kV switchyard for collector DTS Gorica | 2012-2013 |
DRAVSKE ELEKTRARNE MARIBOR | Formin | Equipment supply and asembly on 110kV switchyard at TPP Formin | 2013 |
ELEKTRO CELJE | Vuzenica | Electric cabinet production for managing and protection, voltage measuring for DTS 110/20kV | 2013 |
ELES | Trbovlje | DTS 110kV rehabilitation at section Trbovlje-Brestanica | 2013 |
C & G LJUBLJANA | Podvelka | Equipment for DTS 110/20kV Podvelka | 2013 |
ELES | Ilirska Bistrica | DTS 110/20kV Ilirska Bistrica | 2013 |
ELES | Krško | Construction and electrical installation work on DV 2x110 kV Krško-Hudo | 2014 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Supply and installation of equipment for 400 kV GIS switchyard for new Unit 6 in TPP Šoštanj | 2014 |
ELEKTRO CELJE | Celje | Electrical installation and earthworks for the removal of icebreaking in 2014 - 20 kV Lokovica | 2014 |
ELEKTRO MARIBOR, ELES | Podvelka | 110/20 kV Podvelka - secondary equipment | 2014 -2015 |
ELES | Podlog | Supply cabinets secondary equipment and its own use, assembly work in DTS Podlog | 2014 - 2016 |
ELEKTRO CELJE | Slovenj Gradec | Electrical installation works at the distribution transformer stations 110/20 kV Slovenj Gradec, | 2016 |
ELEKTRO CELJE | Vuzenica | Electrical installation works at the distribution transformer stations 110/20 kV Vuzenica, Vuzenica TR1 | 2016 |
ELEKTRO CELJE | Brežice | Electrical installation works at the distribution transformer stations 110/20 kV Brežice | 2016 |
ELEKTRO CELJE | Rogaška Slatina | Electrical installation works at the distribution transformer stations 110/20 kV Rogaška Slatina | 2016 |
DRAVSKE ELEKTRARNE MARIBOR | Fala | Equipment and assembly for 110 kV switchyard in HPP Fala | 2016 |
ELES | Brežice | Supply and assembly of secondary equipment for connecting line 2 x 110 kV HPP Brežice | 2016 |
ELEKTRO MARIBOR | Dobrava | Complete civil and installation works in 10 kv and 20 kV switchyard and command building at DTS 110/10,20 kV Dobrava | 2017-2018 |
KOLEKTOR IGIN | Divača | Reconstruction of switchyard 400/220/110kV DTS Divača | 2017-2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Supply and installation of 220 kV equipment and equipment for managing and protection for the needs of connection of Unit 5 (TPP Šoštanj) | 2017-2018 |
ELEKTRO LJUBLJANA | Ivančna Gorica | DTS 110/20 KV Ivančna Gorica (civil works) | 2018 |
ELES | Podlog | Electrical installation works | 2018-2020 |
ELES | Podlog | Manufacture, supply and installation of equipment for own use and secondary equipment | 2018-2021 |
ELES | Podlog | Arrangement of business area in Podlog | 2018-2019 |
ELEKTRO MARIBOR | Dobrava | Primary and secondary equipment for DTS 110/20/10 KV Dobrava | 2018-2019 |
SIJ ACRONI | Jesenice | Supply, installation and connection of 5 kV switchgear for ZRM drives | 2019 |
C&G LJUBLJANA | Vojnik | Installation of 110 kV switchgear DTS Vojnik | 2019 |
ELES | Ljubljana | Battery storage NEDO | 2020-2021 |
ELES | Ljubljana | Supply of secondary equipment, manufacture and assembly of secondary equipment and electro works for DTS Beričevo | 2020-2021 |
ELEKTRO PRIMORSKA | Vrtojba, Idrija | Replacement of secondary equipment for DTS 110/20 kV Vrtojba and DTS 110/20 kV Idrija | 2020-2021 |
KOLEKTOR IGIN | Dobruška vas | Supply and manufacture of electrical cabinets 110/20 kV DTS Dobruška vas | 2020-2021 |
KOLEKTOR IGIN | Krško | DTS Krško: Supply of secondary equipment and manufacture of cabinets | 2020-2021 |
C & G LJUBLJANA | Beričevo | DTS Beričevo: Supply and installation of LR equipment | 2020-2021 |
ELEKTRO CELJE | Celje | Electrical installation works in the 110/20/10 kV DTS Lava in Celje | 2020 |
KOLEKTOR KOLING | Beričevo | DTS Beričevo - electrical and mechanical installations | 2020-2021 |
KOLEKTOR KOLING | Velenje | 110/20 kV Velenje DTS - electrical and mechanical installations | 2020-2021 |
ELES | Tolmin | Supply and installation of secundary equipment DTS Tolmin | 2020-2022 |
PRODUCTION AND DISTRIBUTION OF HEATING ENERGY
Investor | Location | Project | Year |
PREMOGOVNIK VELENJE | Velenje | Construction of the main heating plant of the coal mine, heat substation 1,5 MW, heat substation 2 MW | 1995, 1998 |
TOVARNA USNJA | Šoštanj | Temperature reduction station - production and supply of mechanical equipment, mechanical and electrical installations | 1995 |
TERMOELEKTRARNA BRESTANICA | Brestanica | Moving of the high pressure boiler with corresponding auxiliary systems and equipment | 1996 |
MESTNA OBČINA VELENJE | Topolšica | Hot water conduit Topolšica | 1996 |
KOMUNALNO PODJETJE VELENJE | Topolšica | Heat - reduction station Topolšica | 1996 |
GORENJE | Velenje | Reconstruction of the main heat station | 1996 |
GORENJE | Velenje | Heat substation - reconstruction, design and performing mechanical works | 1996 |
MESTNA OBČINA VELENJE | Topolšica | Hot water conduit Topolšica | 1996 |
KOMUNALNO PODJETJE VELENJE | Velenje | Reconstruction of the heat station TPP-029 | 1997 |
KOMUNALNO PODJETJE VELENJE | Velenje | Reconstruction of the heat station TPP-023 | 1998 |
NARAVNO ZDRAVILIŠČE TOPOLŠČICA | Topolšica | Reconstruction of heat substation in hotel Topolščica | 1998 |
MESTNA OBČINA VELENJE | Velenje | Measuring and pressure reduction station for gas | 1998 |
MESTNA OBČINA VELENJE | Velenje | Hot water conduit and water supply Trebuša | 1998 |
KOMUNALNO PODJETJE VELENJE | Velenje | Hot water conduit insulation | 2000 |
KS ŠOŠTANJ | Šoštanj | District heating system of the town | 1980-2000 |
GORENJE | Velenje | Hot and warm water conduits, conduits between buildings | 1996-2000 |
VIPAP VIDEM KRŠKO | Krško | Heating | 2000 |
ENERGETIKA CELJE | Celje | Hot water conduits | 2000 |
GEOPLIN | Polzela | Measuring regulation station Polzela | 2000 |
KOMUNALNO PODJETJE VELENJE | Velenje | Reconstruction of the heat substation TPP-Foitova 6,8,10 | 2000 |
KOMUNALNO PODJETJE VELENJE | Velenje | Main hot water conduit CEP TEŠ phase IV/B | 2002 |
KOMUNALNO PODJETJE VELENJE | Velenje | Main hot water conduit CEP TEŠ phase IV/C | 2002 |
KOMUNALNO PODJETJE VELENJE | Velenje | Main hot water conduit TEŠ-TUŠ phase 1 | 2002 |
GEOPLIN | Ljubečna | Measuring regulation station Ljubečna | 2002 |
KOMUNALNO PODJETJE VELENJE | Velenje | Reconstruction of the heat station TPP-106 for the Gradis building | 2002 |
KOMUNALNO PODJETJE VELENJE | Velenje | Construction of the primary feeder line to TPP 02 and reconstruction of the heat stations Foitova 4 and 2 | 2002 |
KOMUNALNO PODJETJE VELENJE | Velenje | Reconstruction of the insulation of the hot water conduit 2 x DN 350 TEŠ-TUŠ | 2003 |
ZDRAVSTVENI DOM VELENJE | Velenje | Reconstruction of the insulation of the hot water conduit 2 x DN 350 TEŠ-TUŠ | 2003 |
KOMUNALNO PODJETJE VELENJE | Velenje | Reconstruction of the heat substation TPP 349 | 2003 |
ENERGETIKA CELJE | Celje | Sanitation of the insulation of a hot water conduit DN 250 - DN 80 at Lava and Hudinja | 2003 |
MESTNA OBČINA CELJE | Celje | Hot water conduit DN 100, transposition of the gas conduit SN 100 at the Salezijanci site | 2003 |
MESTNA OBČINA CELJE | Celje | Hot water conduit DN 150 at the Golovec sporting center | 2003 |
KOMUNALNO PODJETJE VELENJE | Velenje | Hot water network sanitation from J5096 -J5091 | 2004 |
KOMUNALNO PODJETJE VELENJE | Velenje | Hot water network sanitation from Heating substation 413 | 2004 |
KOMUNALNO PODJETJE VELENJE | Velenje | Isolation and support construction sanitation on main hot water conduit Šoštanj - Podhrastnik, 1. phase | 2004 |
KOMUNALNO PODJETJE VELENJE | Velenje | Isolation and support construction sanitation on main hot water pipeline CEP-TEŠ, phase 5 | 2004 |
ENERGETIKA CELJE | Celje | Reconstruction of boiler house LAVA II. phase -exchange of heating boilers 2 x 8 MW | 2004 |
ZDRAVSTVENI DOM VELENJE | Velenje | Reconstruction of Mixing Heat stations | 2004 |
ENERGETIKA CELJE | Celje | Reconstruction of the heat station TPP-Vošnjakova 2 and TPP Kraigherjeva 32 | 2005 |
TO M | Maribor | Cogeneration unit erection | 2005 |
ACRONI | Jesenice | Horizontal heating points modernization | 2005 |
ENERGETIKA LJUBLJANA | Ljubljana | Installation of steam boiler 10 MW in TOŠ | 2006 |
ENERGETIKA LJUBLJANA | Ljubljana | Electrical steam reheating | 2006 |
ENERGETIKA LJUBLJANA | Ljubljana | Cooling of pumping station,construction of main cooling statin for sport centre facility Stožice | 2006-2007 |
ISKRA INVEST | Kranj | Boiler room reconstruction with power 7.5MW | 2007 |
KOMUNALNO PODJETJE VELENJE | Velenje | Central energy plant 70MW reconstruction works | 2006 - 2010 |
TERMOELEKTRARNA TOPLARNA LJUBLJANA | Ljubljana | Assembly of main steam pipeline B2 | 2007 |
NARAVNO ZDRAVILIŠČE TOPOLŠICA | Topolšica | Hot water pipeline and water supply replacement | 2008 |
KOMUNALNO PODJETJE VELENJE | Velenje | District cooling in Velenje and surrounding buildings | 2008 |
KOMUNALNO PODJETJE VELENJE | Velenje | Implementation a new heating station 315 with connectors | 2008 - 2009 |
ENERGETIKA MARIBOR | Maribor | Hot water pipeline Koroški most | 2009 |
KOMUNALA KOČEVJE | Kočevje | Extention of District heating line | 2009 |
KOMUNALNO PODJETJE VELENJE | Velenje | Relocation of heating station | 2009 |
SGP ZASAVJE | Trbovlje | Electrical works for reconstruction of cooling system | 2010 |
EL-TEC MULEJ | Maribor | Hot water pipeline on student campus area | 2010 |
EL-TEC MULEJ | Celje | District heating pipeline in Celje | 2010 |
JP ENERGETIKA LJUBLJANA | Ljubljana | Eqwuipment supply for central cooling station Stožice | 2010 |
KOMUNALNO PODJETJE VELENJE | Velenje | Reconstruction of central heating plant - pump station | 2010 |
EL-TEC MULEJ | Maribor | Boiler room reconstruction and replacement a new heating station | 2011 |
KOMUNALNO PODJETJE VELENJE | Lokovica | Extention of District heating line in Lokovica 1st phase | 2010-2011 |
KOMUNALNO PODJETJE VELENJE | Velenje | 5087 shaft implemntation and connection the new TS in Pohrastnik | 2012 |
GOLEA NOVA GORICA | Nova Gorica | Boilers replacement in a boiler room with new biomass boilers | 2012 |
OBČINA ILIRSKA BISTRICA | Knežak | Heat energy supply for school Tone Tomšič, Knežak | 2012 |
ECO ATMinvest | Nova Gorica | Hot water heating system line in shopping center | 2012 |
OBČINA ILIRSKA BISTRICA | Ilirska Bistrica | Heat energy supply for school Dragotin Kette, Ilirska Bistrica | 2012 |
COLT INTERNATIONAL | / | Manufacturing and assembly of a boiler house heating system | 2013 |
SMS MEVAC | Ravne | Boiler room SMS Mevac / Metal Straight | 2014 |
KOMUNALA SLOVENJ GRADEC | Mislinja | The rehabilitation of Mislinja boiler room in Elementary School | 2014 |
KOMUNALNO PODJETJE VELENJE | Šoštanj | Technological upgrading of the hot water system in Preseren Square, Square of Freedom and Square of brothers Mravljak in Šoštanju - Phase 1 | 2014 |
KOMUNALNO PODJETJE VELENJE | Šoštanj | Technological upgrading of the hot water system in Preseren Square, Square of Freedom and Square of brothers Mravljak in Šoštanju - Phase 2 | 2015 |
KOMUNALNO PODJETJE VELENJE | Velenje | Technological upgrading of the heating station TPP 068, Koroška 37a and ITP 68A Koroška 37b, Velenje | 2015 |
KOMUNALNO PODJETJE VELENJE | Šoštanj | Hot water connection line for Šoštanj industrial cone | 2016 |
MESTNA OBČINA MARIBOR | Maribor | Hot water pipeline Prežihova and Gregorčičeva street Maribor | 2016 |
KOMUNALNO PODJETJE VELENJE | Velenje | Reconstruction of internal station IHS 340-5 | 2017 |
MINISTRSTVO ZA OBRAMBO REPUBLIKE SLOVENIJE | Postojna | Complete reconstruction of boiler room at barracks Bač | 2017 - 2019 |
KOMUNALNO PODJETJE VELENJE | Velenje | Maintenance works on the district heating system in Šaleška dolina | 2018 |
DOLB BOVEC | Bovec | Remote heating to wood biomass Bovec - Purchase, delivery and installation biomass boiler including construction works | 2018 |
KOMUNALNO PODJETJE VELENJE | Velenje | Technological renovation of heat substation 325 | 2018 |
KOMUNALNO PODJETJE VELENJE | Velenje | Technological renovation of heat substation 330 | 2018 |
OBČINA BOVEC | Bovec | Renovation of the boiler room of the gym and the cultural center in Bovec | 2018 |
KOMUNALNO PODJETJE VELENJE | Velenje | Maintenance works on the district heating system in Šaleška dolina | 2019 |
MESTNA OBČINA MARIBOR | Maribor | Hot water pipeline from Dravograjska cesta (Qlandia) to Kamenškova ulica | 2019 |
METKA EPC | Ljubljana | TE TOL: Execution of Mechanical and Electrical Works for the District Heating Lines relocation | 2020 |
JP KOMUNALA SLOVENJ GRADEC | Slovenj Gradec | Construction of boiler plant on wood biomass | 2020-2021 |
METALLURGY
Investor | Location | Project | Year |
ACRONI | Jesenice | Steel works-design and implementation of electrification and computer control of the alloy and additive transport and adjustment in the steel works | 1987 |
ACRONI | Jesenice | Reconstruction of a hot rolling mill - electrifica-tion, industrial installations and cooling system | 1993 |
ACRONI | Jesenice | Revamping of hot rolling mill-electrification, installation and cooling system | 1996 |
TALUM | Kidričevo | Internal power consumption | 2000 |
ACRONI | Jesenice | Modernization of VOD device | 2003 - 2004 |
ACRONI | Jesenice | Reducing the consumption of cooling water in production | 2004 - 2005 |
ACRONI | Jesencie | Several projects of horizontal preheaters/ | 2004 - 2012 |
ACRONI | Jesencie | Several projects of designing, supply and installation of TS | 2004 - 2013 |
CINKARNA CELJE | Celje | Squeezing and drying of the gel before calcination, electrical instalations | 2004 |
ACRONI | Jesenice | Several projects of horizontal preheaters/ | 2004 - 2012 |
ACRONI | Jesenice | Electrical installations and remote supervision with rudder control for project "Spiral water" | 2005-2006 |
ACRONI | Jesenice | Electro installations on dedusting unit | 2006 |
ACRONI | Jesenice | Lightning conductor installations | 2006 |
ACRONI | Jesenice | Installation renewal on VOD unit | 2006 |
ACRONI | Jesenice | Waste water treatment plant for scall pits Blooming and Steckel | 2006 - 2008 |
METAL RAVNE | Ravne na Koroškem | Electrical works and mechanical installations on project Nova kovačnica | 2007 - 2008 |
METAL RAVNE | Ravne na Koroškem | Several projects of horizontal preheaters/ | 2007 - 2010 |
ACRONI | Jesenice | Mechanical and electrical instalations in new heavy machinery production | 2007 |
METAL RAVNE | Ravne na Koroškem | New heavy machinery production (Kovačnica težkih odkovkov) | 2007 - 2008 |
ACRONI | Jesenice | Sludge treatment process/plant - Waste water treatment plant for scall pits Blooming and Steckel | 2008 |
METAL RAVNE | Ravne na Koroškem | Electricity works and mechanical installations on project Steel plant 2 | 2008 |
METAL RAVNE | Ravne na Koroškem | Several projects of designing, supply and installation of TS | 2008 - 2013 |
ACRONI | Jesenice | Supply and assembly on switchboard Sivacon | 2009 |
ACRONI | Jesenice | Pipe line works at he energetic channel | 2009 |
ACRONI | Jesenice | Electrical equipment supply for Transport line of heavy steel plates | 2009 |
ACRONI | Jesenice | Electrical works on project 353 | 2009 |
ACRONI | Jesenice | Preparation of technological water for Cooling system of Continues casting Device | 2009 - 2010 |
ACRONI | Jesenice | Modernization of Continous Casting (Kontiliv) device - dissmantling of equipment, assembly of new equipment, with mechanical and electrical installations | 2009 |
ACRONI | Jesenice | Transportation of heavy plates | 2009 - 2010 |
PETROL ENERGETIKA | Štore | Energy supply | 2010 |
METAL RAVNE | Ravne na Koroškem | Designing - DD | 2010 |
ACRONI | Jesenice | Project Pickling Bath 3 with PSL (washing and drying line) | 2010 - 2011 |
METAL RAVNE | Ravne na Koroškem | Installation works on a new production hall | 2011 |
ACRONI | Jesenice | Electrical works of the modernisation frameworks Blooming | 2011-2012 |
ACRONI | Jesenice | Cable removing from cable trays on the area Blooming | 2011 |
METAL RAVNE | Ravne na Koroškem | ESR | 2011 |
METAL RAVNE | Ravne na Koroškem | ESR TS | 2011 - 2012 |
ARCELOR MITTAL STEEL | Zenica, BiH | System of collecting, transportation and treatment of wastewaters for company AM Zenica (project documentation) | 2011 - 2012 |
ACRONI | Jesenice | Plate Mill | 2012 - 2013 |
METAL RAVNE | Ravne na Koroškem | Reconstruction of TS in Metal Ravne | 2014 |
METAL RAVNE | Ravne na Koroškem | VOD | 2013-2015 |
ACRONI | Jesenice | Manufacture, supply, installation and commissioning Lužilne kadi 1 | 2014 - 2015 |
ACRONI | Jesenice | AOD converter | 2016-2017 |
METAL RAVNE | Ravne na Koroškem | Execution of installation works on facility "New continuous steel casting furnace for heat treatment in the Rolling mill" | 2017 |
ACRONI | Jesenice | Rehabilitation and reinforcement of the construction of the crane line grt=+24,500m in the metal casting hall | 2017-2018 |
PETROL ENERGETIKA, PE ENERGETIKA ŠTORE | Štore | Replacement of the pipeline SIIIa and returning SIII from the shaft J to the steel factory | 2018 |
INSTALLATIONS - ELECTRICAL
GORENJE NOTRANJA OPREMA | Velenje | Napajanje in krmiljenje ?rpalk v lakirnici | 1996 |
GORENJE | Velenje | Elektrifikacija proizvodnih hal | 1992-1997 |
OB?INA LJUBNO | Radmirje | Cestna razsvetljava Radmirje | 1997 |
OB?INA ŠOŠTANJ | Šoštanj | Cestna razsvetljava | 1998 |
LUKA KOPER | Koper | Razširitev kapacitet rezervoarjev za kemikalije -izvedba elektrifikacije | 1998 |
BOLNIŠNICA CELJE | Celje | Požarno javljanje | 1998 |
MLEKARNA ARJA VAS | Arja Vas | Sanacija razsvetljave | 1999 |
VIPAP VIDEM KRŠKO | Krško | Razsvetljava | 2000 |
ELEKTRO MARIBOR | Maribor | Obnova elektro instalacij jakega in šibkega toka v poslovni stavbi Elektro MB | 2000 |
GORENJE | Velenje | UPS - neprekinjeno napajanje | 1999-2000 |
GORENJE IPC | Velenje | Elektro instalacije na objektu mini kuhinje | 1999-2000 |
ELEKTRO LJUBLJANA | Ljubljana | Izvedba elektro in strojnih instalacij za potrebe DCV v Stari mestni elektrarni Ljubljana | 2001 |
GORENJE | Velenje | Elektromontažna dela za NTHT - tehnološka linija PUR 5 | 2001 |
KOMUNALNO PODJETJE VELENJE | Velenje | Odplinjanje deponije komunalnih odpadkov | 2002 |
SEAWAY | Velenje | Izvedba elektri?nih, strojnih instalacij in izdelava obdelovalne komore ter pomo? pri montaži obdelovalne linije | 2002 |
LUKA KOPER | Koper | Zamenjava SN in NN stikalnega bloka | 2002 |
GORENJE NOTRANJA OPREMA | Velenje | Preureditev merilnih mest | 2002 |
GORENJE | Velenje | Hala nove plastike | 2002 |
GORENJE | Velenje | Izvedba elektroinstalacij za razsvetljavo in mo? v regalnem skladiš?u KA | 2002 |
LUKA KOPER | Koper | Infrastrukturna ureditev skladiš?a št. 51 | 2002 |
VIPAP VIDEM KRŠKO | Krško | NN instalacije pogonov | 2003 |
SPG-SOL PLIN GORENJSKA | Jesenice | Dobava in montaža kablov, kon?nikov | 2003 |
GORENJE | Velenje | Izvedba elektroinstalacij za Navis - visokoregalno avtomatsko skladiš?e | 2003 |
GORENJE | Velenje | NAVIS - zunanja ureditev - elektrifikacija | 2003 |
SIEMENS | Ljubljana | Elektro instalacije na EM Blooming | 2004-2005 |
KOTO | Ljubljana | Elektro inštalacije v novi tovarni | 2005-2006 |
GORENJE VALJEVO | Valjevo, SRB | Elektrifikacija nove tovarne hladilne tehnike | 2006 |
GORENJE | Velenje | Elektro dela na proizvodnji vrat v Biterm-u | 2006 |
GORENJE | Velenje | Izvedba rekonstrukcije v hali Štedilniki | 2006 |
GORENJE | Šoštanj | Izvedba el. instalacij za objekt proizvodna hala z aneksom in spremljajo?imi objekti | 2007 |
CP MARIBOR | Ravne na Koroškem | Elektro dela na sistemski tehniki | 2008 |
ENERGETIKA LJUBLJANA | Ljubljana | Dobava in montaža VN bremenskih stikal ter popravilo kompenzacijske naprave | 2009 |
ELES | Laško | Izdelava in dobava omar sekundarne opreme, omaric merilne napetosti, lastne rabe, kablov in izvajanje el. montažnih del | 2010 |
GORENJE NOTRANJA OPREMA | Maribor | Ureditev napajanja z elektri?no energijo na obmo?ju GNO in Marlesa | 2010 |
RUDIS TRBOVLJE | Hrastnik | Izvedba SPTE Toplarna Hrastnik | 2010 |
ESOTECH SOLUTIONS | Stara Pazova, SRB | Elektroinštalaicijska dela | 2010-2011 |
RUDIS TRBOVLJE | Planina | Izvedba SPTE Planina | 2011 |
KONTROLA ZRA?NEGA PROMETA SLOVENIJE | Brnik | Dobava in polaganje kabelskih napeljav za energetsko napajanje objekta - ATCC | 2011 |
GORENJE | Velenje | Celovito izvajanje elektro meritev | 2011-2017 |
SIEMENS | / | 400 kV GIS - elektromontažna dela | 2013 |
GORENJE | Velenje | Izvedba elektro inštalacij za tehnologijo, razsvetljavo in malo mo? | 2013 |
CALCIT | Moste | NN priklju?ek za pralno postajo Moste | 2014 |
GORENJE | Velenje | Rekonstrukcija strelovodne inštalacije na objektu Turna | 2016 |
LUKA KOPER | Koper | Membransko stikalo | 2017 |
GORENJE | Velenje | Dolgoro?no sodelovanje na podro?ju el. meritev | 2017-2018 |
GORENJE | Velenje | Razna elektroinštalacijska dela | 2017-2018 |
C&G LJUBLJANA | Talum Kidri?evo | Zaš?itne stene usmerniških naprav elektrolize HC - Talum Kidri?evo | 2019 |
MINISTRSTVO ZA OBRAMBO RS | Ljubljana | Pregled nizkonapetostnih elektro inštalacij in pregled strelovodov | 2019 |
FRAPORT LJUBLJANA | Ljubljana | Izgradnja centralnega energetskega objekta za oskrbo obstoje?ih in novih objektov na obmo?ju letališ?a Jožeta Pu?nika - elektro instalacije | 2019 |
PETROL | Štore | Prestavitev merilne linije | 2020 |
KOLEKTOR KOLING | Beri?evo | RTP Beri?evo - elektro in strojne instalacije | 2020-2021 |
KOLEKTOR KOLING | Velenje | RTP 110/20 kV Velenje - elektro in strojne instalacije | 2020-2021 |
GORENJE | Velenje | Dolgoro?no sodelovanje na podro?ju el. meritev v letu 2021 | 2021 |
INSTALLATIONS - MECHANICAL
Investor | Location | Project | Year |
TOPLARNA KULKWITZ - ZRN | Kulkvvitz, DEU | Design, mechanical equipment, power and control systems, mechanical and electrical equipment, installation and startup | 1980-1981 |
RUDIS | Zeulenrode, DEU | Industrial installations - hygienic gloves production plant | 1988 |
TE - TOL | Ljubljana | Heating, air conditioning and hydrant networks | 1986 |
RUDIS | Sevnica | Cooling house - industrial installations | 1988 |
OBČINA MISLINJA | Mislinja | Connection of auxiliary systems including a pipeline, diameter 700 m, length approx. 3000 m | 1992 |
GORENJE | Velenje | Installation of machinery, mechanical industrial installations | 1994 |
TOVARNA USNJA | Šoštanj | Temperature reduction station - production and supply of mechanical equipment, mechanical and electrical installations | 1995 |
GORENJE | Velenje | Installations for technical gases, hotwater conduits, water supply | 1995-1999 |
GORENJE | Velenje | Aspiration, air conditioning, heating, electrification | 1996-1997 |
EMKOR | Rogatec | Industrial and structural installations | 1997 |
PIVOVARNA LAŠKO | Laško | Production and installation of ventilation systems | 1997 |
TERMOELEKTRARNA BRESTANICA | Brestanica | Installation of a cooling system | 1997 |
ELKROJ MOZIRJE | Nazarje | Design and installation of mechanical electrical installations | 1997, 2002 |
A - FINING | Velenje | Office building - air conditioning, heating, water supply, heat station | 1997 |
GORENJE | Velenje | Reconstruction of a compressed air station | 1997 |
ELKROJ MOZIRJE | Mozirje | Industrial installations in a sewing room | 1997 |
DAIFUKU EUROPE | Novo Mesto | Production and installation of a production line for the assembly of car doors for Renault X 65 (Clio II) | 1998 |
EKONOMSKA FAKULTETA | Ljubljana | Electrical and mechanical installations, air conditioning | 1999 |
MESTNA OBČINA VELENJE | Velenje | Musical school - external and internal hydrant network, air conditioning, ventilation, heating, water supply, heat station | 1997-1998 |
PREMOGOVNIK VELENJE | Velenje | Technological water distribution system | 1999-2000 |
GORENJE | Velenje | New cooling equipment production plant - heating, ventilation, air conditioning, compressed air | 1999-2000 |
TERMOELEKTRARNA BRESTANICA | Brestanica | Hydrant network | 2000 |
GEOPLIN LJUBLJANA | Polzela | Measuring and control station for gas - POLZELA | 2000 |
PREMOGOVNIK VELENJE | Velenje | Pipelines | 2001 |
KONUS-KONEX | Slovenske Konjice | Dismantling of the existing line SPANRAHMA | 2002 |
RTV SLOVENIJA | Ljubljana | Replacement of fans and convectors | 2002 |
ELKROJ MOZIRJE | Nazarje | Replacement of the steam and condensed water conduits on a bridge | 2002 |
CINKARNA CELJE | Celje | Transposition of the power conduits | 2003 |
ACRONI | Jesenice | Erection of slag moisturing | 2005 |
CORRUS | Jesenice | Production line erection | 2005 |
WELLMAN | Jesenice | Supply and installation of pipelines | 2005 |
LIVARNA VUZENICA | Vuzenica | Extention of cooling line HWS | 2006 |
ACRONI | Jesenice | Relocation of power line and demolition of steel structures | 2007 |
MINERVA ŽALEC | Žalec | Execution of store for finished products | 2008 |
CP MARIBOR | Ravne na Koroškem | Mechanical works | 2008 |
RTV | Ljubljana | Device restoration in RTV buildings | 2008 |
KOMUNALNO PODJETJE VELENJE | Trebuša | Pipeline gas installation works in the building | 2009 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance works on energetic devices, unit 1-5 | 2009 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Transfering the cooling pipeline system on B3 and B4 | 2009 |
JP ENERGETIKA LJUBLJANA | Ljubljana | Mechanical and installation works | 2010 |
ACRONI | Jesenice | Increasing the washing capacity and pickling baths line | 2010 |
MPI-RECIKLAŽA | Žerjav | Replacement of outlet tube for RDP | 2010 |
ACRONI | Jesenice | Mechanical installation works on project 353 | 2010 |
SMS INNSE | Jesenice | Modernization of roller conveyors | 2011 |
GORENJE NOTRANJA OPREMA | Velenje | Execution works for dryer ATM2 | 2011 |
METAL RAVNE | Ravne na Koroškem | Manufacturing of the measuring points at EPŽ | 2011 |
ACRONI | Jesenice | Manufacture, supply and installation of the erection structures | 2011-2012 |
ENERGETIKA CELJE JAVNO PODJETJE | Celje | TS Revision in Energetika Celje | 2012 |
ACRONI | Jesenice | DCW pipelines | 2012 |
MESSER SLOVENIJA | Škofja Loka | Measuring, control and instrumentation system | 2017-2018 |
MINISTRSTVO ZA OKOLJE IN PROSTOR | Ravne na Koroškem, Prevalje | Ensuring flood safety and ensuring the stability of the riverbed of the Meža River at Ravne and Prevalje | 2018-2020 |
VGP DRAVA PTUJ | Mislinja | Ensuring flood safety of the industrial zone along the Mislinja River | 2020 |
ACRONI | Jesenice | Assembly works - renovation of 90 Mvar SVC | 2020-2021 |
KOLEKTOR KOLING | Beričevo | DTS Beričevo - electrical and mechanical installations | 2020-2021 |
KOLEKTOR KOLING | Velenje | 110/20 kV Velenje DTS - electrical and mechanical installations | 2020-2021 |
SERVICING OF LV AND MV MACHINERY
Investor | Location | Project | Year |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Re-coiling of two high voltage electric motors for the turbine feeder pump - 5600 kW, 10 kV | 1994-1995 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Vacuum impregnation of a high voltage electric motor 1050 kW, 6000 V | 1995 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Re-coiling of a high voltage electric motor 10 kV, 900 kW for the mill at the unit 4 | 1995 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Re-coiling of a high voltage electric motor 10 kV, 6400 kW for the mill at the unit 5 | 1996 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Remediation of three high voltage motors, 10 kV, 6,4 MW at unit 5 | 1996 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Stator analvsis of three high voltage motors for the feeder pump at unit 4, 10 kV, 5,6 MW | 1997 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Re-coiling of two high voltage electric motors, 6kV, 200 kW, re-coiling of three high voltage electric motors, 6kV, 250 kW | 1997-1998 |
PREMOGOVNIK VELENJE | Velenje | Overhaul of six electric motors 6 kV, 400 KW, remediation of the coils of an electric motor 400 kW, 6 kV | 1996 |
PREMOGOVNIK VELENJE | Velenje | Re-coiling of a fully commutated motor 105/315 kW, re-coiling of a fully commutated motor 65/200 kW | 1997 |
ACRONI | Jesenice | Renovation of the coil insulation and balancing of the rotor of the synchronous generator, 3750 kVA, 6,3 kV | 1995 |
SALONIT | Anhovo | Re-coiling of a high voltage electric motor 1 MW, 10 kV; re-coiling of a high voltage electric motor 1,7 MW, 10 kV | 1995-1996 |
SOŠKE ELEKTRARNE NOVA GORICA | Nova Gorica | Hydro power plant Plave - general overhaul of a generator, 10500 kW, 11000 V | 1995-1996 |
ACRONI | Jesenice | Re-coiling of the stator of an electric motor 315 kW, 6 kV | 1996 |
CINKARNA CELJE | Celje | Servicing of a DC electric motor 280 kW, 600 V; re-coiling of a high voltage motor 6 kV, 250 kW | 1996-1997 |
SLADKOGORSKA PALOMA | Sladki vrh | Re-coiling of the pole rotor and stator of a DC motor 90 kW | 1997 |
ENERGETIKA LJUBLJANA | Ljubljana | Servicing of electric motors, 200 kW | 1997 |
REVOZ | Novo mesto | Servicing of a high voltage motor 6 kV, 400 kW for a compressor and installation of thermic sensors | 1997 |
SLADKOGORSKA PALOMA | Sladki vrh | Re-coiling of the rotor of a DC motor, 145 kW | 1998 |
BENNING, AEG | Bocholt, DEU | Production of stator coils for motors, 75 kW, 1,4 kV | 1996 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Re-coiling of the stator of a high voltage motor Rade Končar 200 kW, 6 kV | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Re-coiling of the stator of a high voltage motor Rade Končar 5AZ X 1207-4; 1500 kW, 10 kV | 2003 |
BPT TRŽIČ | Tržič | Re-coiling of the stator of a hydrogenerator 1 at the hydro power plant II AEG Union type ATN 8/660/750 660 kVA, 6,6 kV, 57,5 A | 2003 |
SILKEM | Kidričevo | Brown&Boveri motor repair and repair of Siemens starter and Siemens rotate transformer | 2004 |
SILKEM | Kidričevo | Repair of electro motor Siemens 110 kW after damage | 2004 |
SILKEM | Kidričevo | Repair of electro motor and starter Siemens Scheckert 80 kW | 2004 |
SILKEM | Kidričevo | Refit of generator Caterpiller KG1 | 2004 |
SILKEM | Kidričevo | Refit of generator Caterpiller KG2 | 2004 |
PREMOGOVNIK VELENJE | Velenje | Revision and repair of electro motor HELMKE DKRAJ 6 kV, 600 kW | 2004 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacemnt of stator coil for motor SIEMENS 250kW | 2004 |
ACRONI | Jesenice | Renewal of EM rotor for aspiration device in Unit PC hot modification, type SEVER 800 kW | 2005 |
ACRONI | Jesenice | Repair of electro motor Rade Končar, 800 kW | 2005 |
SILKEM | Kidričevo | Refit of motor Brown&Boveri 340 kW | 2005 |
SILKEM | Kidričevo | Repair of starter Siemens Schuckert 114 kW | 2005 |
SILKEM | Kidričevo | Repair of motor Siemens after damege 520 kVV | 2005 |
SILKEM | Kidričevo | Repair of electro motor NANCY 736 kW | 2005 |
SILKEM | Kidričevo | Refit on motor ELIN 30 kW | 2006 |
SILKEM | Kidričevo | Refit on motor NANCY 773 kW | 2006 |
SILKEM | Kidričevo | Refit on motor RADE KONČAR 132 kW | 2006 |
SILKEM | Kidričevo | Refit on motor RADE KONČAR 35 kW | 2006 |
SILKEM | Kidričevo | Refit on motor Siemens Schuckert 114 kW | 2006 |
SILKEM | Kidričevo | Refit on starter Siemens Schuckert 114 kW | 2006 |
SILKEM | Kidričevo | Refit on starter Siemens Schuckert 80 kW | 2006 |
SILKEM | Kidričevo | Refit on starter Siemens Schuckert 475 kW | 2006 |
SILKEM | Kidričevo | Refit on motor BROVN BOVERI 30 kW | 2009 |
LEK | Mengeš | Refit on motor CARLYLE type NCARHW 6002, 67kW | 2009 |
SILKEM | Kidričevo | Refit on motor SEVER ZKL 180 N-4, 18,5kW, No.: 753034 | 2010 |
SILKEM | Kidričevo | Refit on starter SIEMENS-SCHUCKER, typ: K3300-4/1.5h2, No.: 151612, 80kW | 2010 |
SILKEM | Kidričevo | Refit on starter SIEMENS-SCHUCKER, No.: 151620, 475kW | 2010 |
SILKEM | Kidričevo | Refit on motor Rade Končar type: 2AZ 407-4, 56kW | 2010 |
SILKEM | Kidričevo | Remediation of electric motors, starters, chockes and other material | 2010 |
SILKEM | Kidričevo | Refit on motor NENCY ASF526/6, 773kW | 2010 |
SILKEM | Kidričevo | Spare parts supply for motor NENCY ASF526/6, 773 kW | 2010 |
SILKEM | Kidričevo | Refit on motor 6D3K SIEMENS R2873, No.: 104275, 520kW | 2010 |
SILKEM | Kidričevo | Refit on starter BROWN BOVERI 85 kW | 2010 |
SILKEM | Kidričevo | Refit on motor 6D3K SIEMENS, 520kW | 2010 |
SILKEM | Kidričevo | Refit on motor SIEMENS SCHUCKER, type CR2061-6 št.: 298562, 80kW | 2010 |
SILKEM | Kidričevo | Refit on motor BROWN BOVERI | 2010 |
SILKEM | Kidričevo | Refit on motor SEVER 1ZKL 280 | 2010 |
SIMBIO | Celje | Deassembly and refit 6 pcs of motor VT1 250 M4 2 pcs, MEC 100 R30 4 pcs | 2010 |
LEK | Ljubljana | Refit on motor CARLYLE typ NCARHW 6002, 67kW, 2900min-1, 143,3A | 2010 |
SILKEM | Kidričevo | Refit on motor KSR type: OL 200 2A-40, 30 kW, No.: 300970 | 2010 |
SILKEM | Kidričevo | Refit and re-coiling motor SEVER typ: NKZ150-4, No.: 123085, 22kW | 2010 |
SILKEM | Kidričevo | Refit on motor AM11/6a, No.:625212, 8,5kW | 2010 |
SILKEM | Kidričevo | Refit on motor typ: VJUS 225 b-4, št.: 329243, 35 kW | 2010 |
SILKEM | Kidričevo | Refit on motor typ: VJUS 225 b-4, št.: 3292248, 35 kW | 2010 |
SILKEM | Kidričevo | Revision of high voltage transformer SIEMENS -SCHUCKER 20KVA | 2010 |
SILKEM | Kidričevo | Refit on starter SIEMENS-SCHUCKER, typ: K3300-/415h2 No.: 151624, 114 kW | 2010 |
SILKEM | Kidričevo | Bearing replacement on cogenration unit | 2010 |
SILKEM | Kidričevo | Bearing replacement, deassembly, assembly and test operation | 2010 |
SILKEM | Kidričevo | Refit on starter SIEMENS-SCHUCKER, type: LB10, No.: 66511, 85kW | 2011 |
SILKEM | Kidričevo | Streamlining the motor driving for the ball mill in the calcination 2 to 4 mill | 2011 |
SILKEM | Kidričevo | Refit on starter BROWN BOVERI 150kW, No. 0128855 | 2011 |
SILKEM | Kidričevo | Refit on starter K3300-73h2 No.:151621, 475kW | 2013 |
LEK | Ljubljana | Re-coiling of the stator of a motor CARLYLE type: NCARHW 6002 | 2013 |
SILKEM | Kidričevo | Refit on motor type: OR2061-6 83, No.298626, 80kW | 2013 |
SILKEM | Kidričevo | Replacing two sets of cable heads for 3x95mm2 cable | 2013 |
SILKEM | Kidričevo | Refit on motor and starter | 2013 |
SILKEM | Kidričevo | Overhaul of electric motor Siemens OR 2061-6 80 kW 400 V | 2014 |
ENERGO PLUS | Ljubljana | Replace bearings and seals on the compressor Carlyle | 2014 |
LEK MENGEŠ | Mengš | Re-coiling of the stator of a motor CARLYLE type: NCARHW 6002 67 kW | 2014 |
Esotech | Velenje | Re-coiling of the stator of a motor RADE KONČAR 4kW | 2014 |
LEK MENGEŠ | Mengš | Re-coiling of the stator and refit of a motor CARLYLE type: NCARHW 6002 67 kW | 2014 |
LEK MENGEŠ | Mengš | Re-coiling of the stator of a motor CARLYLE type: NCARHW 6002 67 kW | 2014 |
LEK MENGEŠ | Mengš | Re-coiling of the stator and refit of a motor CARLYLE type: NCARHW 6002 67 kW | 2014 |
LEK MENGEŠ | Mengš | Re-coiling of the stator and refit of a motor CARLYLE type: NCARHW 6002 67 kW | 2014 |
ENERGO PLUS | Ljubljana | Replace bearings and seals on the compressor Carlyle | 2015 |
ENERGO PLUS | Ljubljana | Replace bearings and seals on the compressor Carlyle | 2015 |
ENERGO PLUS | Ljubljana | Re-coiling of the stator and refit of a motor CARLYLE type: NCARHW 6002 67 kW | 2015 |
KGC KLEMENČIČ | Ljubljana | Re-coiling of the stator and refit of a motor CARLYLE type: NCARHW 6002 67 kW | 2015 |
ENERGO PLUS | Ljubljana | Replace bearings and seals on the compressor Carlyle | 2016 |
ENERGO PLUS | Ljubljana | Re-coiling of the stator and refit of a motor CARLYLE type: NCARHW 6002 67 kW | 2016 |
ENERGO PLUS | Ljubljana | Replace bearings and seals on the compressor Carlyle | 2016 |
FORI | Velenje | Repair of motor 7,5 kW | 2016 |
ENERGO PLUS | Ljubljana | Replace bearings and seals on the compressor Carlyle | 2016 |
ENERGO PLUS | Ljubljana | Replace bearings and seals on the compressor Carlyle | 2016 |
ENERGO PLUS | Ljubljana | Re-coiling of the stator and refit of a motor CARLYLE type: NCARHW 6002 67 kW | 2016 |
ENERGO PLUS | Ljubljana | Motor Mcquay HSW2350L27YA (re-coiling) | 2017 |
ENERGO PLUS | Ljubljana | Motor Charlyle 1605UO1573 - classic (bearings, re-coiling, sealing, ...) | 2017 |
ENERGO PLUS | Ljubljana | Overhaul of the engine CARLYLE 06TUW554ST1C, serial number 1111U08115 | 2018 |
ENERGO PLUS | Ljubljana | Overhaul of the engines MCQUAY, CARLYLE,… | 2019 |
ENERGO PLUS | Ljubljana | Overhaul of the engines CARLYLE, TRANE HELIKATOR, BITZER,… | 2020 |
research and development projects[242kB ]
RESEARCH AND DEVELOPMENT PROJECTS
Investor | Location | Project | Year |
ESOTECH | Velenje | Photovoltaic power plant development project | 2009 |
MINISTRSTVO ZA VISOKO ŠOLSTVO, ZNANOST IN TEHNOLOGIJO | Ljubljana | The development of the technology for increasing the efficiency in the process of elimination of sulfur and mercury from the flue gases in the industrial processes | 2009 in še potekajo/on going |
TERMOELEKTRARNA ŠOŠTANJ/ESOTECH | Velenje | Pilot plant for water preparatoin through the membrane separator | 2009 in še potekajo/on going |
JAVNA AGENCIJA ZA TEHNOLOŠKI RAZVOJ RS | Ljubljana | Development technology for producing biogas from municipal and industrial waste | 2009 in še potekajo/on going |
ESOTECH | Velenje | Membrane technology development project | 2010 in še potekajo/on going |
JP ELEKTROPRIVREDA | Kakanj, BIH | Testing coal combustion: RMU Kakanj, Breza, Zenica. In 70:20:10 in the CFBC combustion technology | 2012 |
MEDNARODNA PODIPLOMSKA ŠOLA JOŽEFA STEFANA | Severni Jadran | Ecological treatment of wastewater from cleaning biological overgrowth from the hull of ships GREENHULL | 2020-2022 |
IGM Zagorje | Zagorje | Technological solution for a pilot test of stabilizer mixing | 2020 |
designing and technical documentation[228kB ]
DESIGNING AND TECHNICAL DOCUMENTATION
Investor | Location | Project | Design phase | Year |
TOPLARNA | Kulkvvitz, DEU | Power systems and control, mechanical and electrical equipment | Design for building permit | 1980-1981 |
GORENJE | Velenje | Power supply and installation | Design for building permit, detail design, as built design | 1998 |
GORENJE | Velenje | P 6 Indop | Detail design, as built design | 1999 |
PREMOGOVNIK VELENJE | Velenje | Electrical installation at paste mixing facility at Škale | Detail design, as built design | 1999 |
LUKA KOPER | Koper | Transformer stations TP4-TRT 2x1000kVA,20/0,4kV TP3-TRT 2x630kVA,20/0,4kV | Design for building permit, detail design, as built design | 1999 |
VEGRAD | Finow-furt, DEU | Technological equipment with a control system via computer network | Design for building permit, detail design, as built design | 1988 |
FEKETI?I | Feketiči, BIH | Electrification in a cooling house | Detail design, as built design | 1988 |
RUDIS | Vladivostok Belebey, RUS | Transportation equipment including the control system | Detail design, as built design | 1990 |
PREMOGOVNIK VELENJE | Velenje | Preparation of dry concrete mixes | Design for building permit, detail design, as built design | 1997-1999 |
PREMOGOVNIK VELENJE | Velenje | Ash preparation plant upgrade | Design for building permit, detail design, as built design | 1997-1999 |
RUDNIK MEŽICA -MPI | Žerjav | Desulphurization of flue gases | Design for building permit, detail design, as built design | 1998-2000 |
PREMOGOVNIK VELENJE | Velenje | Conveyor; W=1200mm, Q=1200t/h | Detail design, as built design | 1999 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Multi-purpose inflow gates | Detail design, as built design | 1999 |
GLIN NAZARJE | Nazarje | Conveying and screening equipment | Detail design, as built design | 1999 |
PETROL | Tržič | Gas network in the town of Tržič | Detail design | 2000 |
KLINIČNI CENTER | Ljubljana | Large convention hall, VKS | Tender documentation, design for building permit, detail design | 2000 |
LESNA | Slovenj Gradec | Filtration of flue gases | Design for building permit, permit for operation | 2000 |
OBČINA ZAGORJE | Zagorje | Boiler house in Zagorje | Design for building permit, detail design, permit for operation | 2000 |
KOTO | Ljubljana | Mechanical and electrical equipment for ventilation | Design for building permit, detail design | 2000 |
ŽITO | Ljubljana | Reconstruction of a transformer station and data transfer project | Detail design | 2000 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Slag transport | Detail design | 2000 |
TERMOELEKTRARNA BRESTANICA | Brestanica | Chemical water treatment | Detail design, as built design | 2000 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Connection of units 1, 2 and 3 to the unit 4 desulphurization plant | Detail design, as built design | 2000-2001 |
GORENJE | Velenje | Transport and storage of PUR components | Detail design, as built design | 2000-2001 |
TOVARNA SLADKORJA ORMOŽ | Ormož | System for loading of sugar into road tankers | Detail design, as built design | 2001 |
TOVARNA SLADKORJA ORMOŽ | Ormož | Modernization of the control system | Detail design, as built design | 2001 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Chain conveyor | Detail design, as built design | 2001 |
TDR | Ruše | Product transportation | Detail design | 2001 |
ACRONI | Jesenice | Reconstruction of dust removal equipment at EOP | PGD, PZI, PID | 2001-2002 |
NIKO | Železniki | Industrial waste water treatment | PZI, PID | 2001-2002 |
ACRONI | Jesenice | Foundations for AAF equipment | PGD, PZI | 2002 |
CINKARNA CELJE | Celje | Water treatment | PGD, PZI | 2002 |
RUDNIK MEŽICA -MPI | Žerjav | Remaking polypropylen into granulate | PGD, PZI | 2002 |
RUDNIK MEŽICA -MPI | Žerjav | Covering / dust removal from metalurgical furnaces | PZI | 2002 |
ACRONI | Jesenice | Piping and electrical equipment for dust removal at the opening no.4 | Design for building permit, detail design | 2002 |
VIPAP VIDEM KRŠKO | Krško | Transformer station | Detail design | 2002 |
GORENJE | Velenje | Transformer station | Detail design | 1998-2002 |
LUKA KOPER | Koper | Transformer station | Detail design | 1998-2002 |
CINKARNA CELJE | Celje | Energent connection | Design for building permit, detail design | 2002 |
REVOZ | Novo Mesto | Transformer station | Study, detail design | 2002 |
ACRONI | Jesenice | Reconstruction of the scale pits, phase 1 | PZI | 2002 |
PREMOGOVNIK VELENJE | Velenje | Reconstruction of the power supply | Detail design | 2002 |
ADRIA MOBIL | Ljubljana | Thermical waste treatment | Detail design | 2002 |
NIKO | Železniki | Industrial waste water treatment plant | Detail design, as built design | 2001-2002 |
TERMOELEKTRARNA BRESTANICA | Brestanica | Technical protection | Detail design | 2002 |
SAVAPROJEKT (za ACRONI) | Jesenice | Modernization of the drying and heating posts | Design for building permit, detail design, as built design | 2002 |
TERMOELEKTRARNA TRBOVLJE | Trbovlje | Desulphurization of flue gases | Conceptual design | 2002 |
PREMOGOVNIK VELENJE | Velenje | Industrial waste water treatment technology | Conceptual design | 2002 |
LUKA KOPER | Koper | Mobile conveyer with a screening unit | Detail design, as built design | 2002 |
VIPAP VIDEM KRŠKO | Krško | hydrant network | Detail design | 2002 |
GORENJE IPC | Velenje | Stiropor transformer station | Design for building permit, detail design | 2002 |
OBČINA ŠOŠTANJ | Šoštanj | Elementary school at the town of Šoštanj | Conceptual design, design for building permit, detail design, as built design | 2002-2003 |
CINKARNA CELJE | Celje | Squeezing and dryng of the gel before calcination | Design for building permit, detail design, as built design | 2002-2003 |
ACRONI | Jesenice | Scale pit refit, phase II. | PGD | 2003 |
GORENJE | Šoštanj | TS Šoštanj transformer station | Design for building permit | 2003 |
ACRONI | Jesenice | Vacuum oxygen decarburisation | PGD, PZI, PID | 2003-2004 |
ACRONI | Jesenice | Reduction of cooling water usage | PGD, PZI | 2003-2004 |
ACRONI | Jesenice | Electrical supply-TP ČRNO water | PZI | 2003 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Slag transport - unit 4 and 5 | Detail design, as built design | 2003-2004 |
SPG SOL PLIN GORENJSKA | Jesenice | Switch yard lronwork plant | PZI, PID | 2003-2004 |
TERMOELEKTRARNA TRBOVLJE | Trbovlje | Flue gas desulphurization | PGD,PZI, PID | 2004-2005 |
ACRONI | Jesenice | Cooling system, EM Blooming | PGD,PZI, PID | 2003-2004 |
ACRONI | Jesenice | Sludge treatment | PGD, PZI | 2005 |
COMET | Zreče | Industrial waste water treatment plant | Conceptual design | 2004 |
PETROL ENERGETIKA PE ŠTORE | Štore | Erection of pumps | Detail design | 2005 |
ELEKTRO-PRIVREDA BIH | Tuzla, BIH | Slag and ash transport in Thermo Power Plant Tuzla | Basic design | 2005-2006 |
METAL | Ravne | Industrial waste water treatment plant | IDP, PDG, PZI | 2005-2006 |
ACRONI | Jesenice | Aspiration unit | IDP, PDG, PZI | 2005 |
ACRONI | Jesenice | Slag moistering | Detail design | 2005 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Unit 6 construction - transportation equipment | Basic design | 2005-2006 |
ACRONI | Jesenice | Switching yard Steel Mili | PZI | 2005 |
PALOMA | Sladki Vrh | Waste incineration | Basic design | 2005 |
Acroni | Jesenice | Heat circulation site | PZI | 2005 |
MPI Reciklaža | Črna na Koroškem | Dust reduction and TOC in flue gases | IDP | 2006 |
CMC | Celje | Limestone transportation | Basic design | 2006 |
DROGA KOLINSKA | Ljubljana | Waste water treatment plant | Design for building permit, detail design | 2006 |
JKP VODOVOD VALJEVO | Valjevo - Srbija | 2. phase of biogas line CPPOV "Gorič-Valjevo" | Basic design | 2006 |
TE TOL | Ljubljana | System for waste water treatment from unit 1., 2., and 3. | Detail design | 2006 |
KOTO | Ljubljana | Biogas line | Detail design | 2006 |
ACRONI | Jesenice | Reconstruction of energetic lines | Detail design | 2006 |
ELEKTRO CELJE | Celje | Switching yard Trnovlje | Design for building permit, detail design | 2006-2007 |
ŠTORE STEEL | Štore | Heating points modernization | Detail design | 2006-2007 |
SALONIT ANHOVO | Anhovo | Switching yard Salonit | Design for building permit, detail design, as built design | 2006-2007 |
RS-MŠZT | Ljubljana | Biological methods of waste water treatment | R&D | 2006-2007 |
RS-MŠZT | Ljubljana | Waste recycling | R&D | 2006-2007 |
RS-MŠZT | Ljubljana | WWTP upgrade in thermo power plants | R&D | 2006-2007 |
NARAVOVARSTVENA ZVEZA SMREKOVEC | Šoštanj, Bele vode | Virtual education game | R&D | 2006-2007 |
PLANTATION TIMBER PRODUCTS GROUP | Hubei, CHN | Wastewater treatment plant -upgrade | Basic design | 2006-2007 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Project documentation, conducting the administrative procedure for the building | IDP, PGD, PZI, PID | 2006-2007 |
BIOFUTURA | Ilirska Bistrica | Project documentation for the io gas plant | IDP | 2007 |
UNIOR | Zreče | Hot water pipeline | PGD, PZI, PID | 2007 |
METAL RAVNE | Ravne | Mechanical and electrical installations for new forging shop | PGD, PZR, PZI | 2007 |
METAL RAVNE | Ravne | Steelworks reconstruction | PGD, PZR, PZI | 2007 |
METAL RAVNE | Ravne | Construction transformer station "Valjarna II" | PGD | 2007 |
ACRONI | Jesenice | Device haul slabs | PGD, PZI, PID, POV | 2007 |
SOLARVALUE PROIZVODNJA | | Extraction of SI-metal | IDP | 2007 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Design documentation for take in and add the biomass | PZI | 2008 |
ACRONI | Jesenice | Design and technical documentation for Konti | IDG, PGD, PZI, POD, POV | 2008 |
ACRONI | Jesenice | Project documentation and supply assembly equipment for TS 4 Javornik and 3 Javornik | PZI | 2008 |
STEKLARNA HRASTNIK | Hrastnik | Project documentation for flue gas cleaning | IDG, PGD, PZI | 2008 |
NIKO | Železniki | Project documentation for energy room and compressor station in TS | PGD | 2008 |
ELEKTRO CELJE | Žalec | Project design for switchyard and 110kV cable to DTS | IDG, PGD, PZI, POD, POV | 2008 |
ACRONI | Jesenice | Project design for the heavy plates transportation | IDG, PGD, PZI, POD, POV | 2008-2010 |
ACRONI | Jesenice | project documentation for "Grinding machine" | IDG, PGD, PZI, POD, POV | 2008/2011 |
MPI RECIKLAŽA | Črna na Koroškem | Project documentation update process on flue gas cleaning | IDP | 2008/2009 |
TAB | Mežica | Project documentation for ventilation and heat recovery | IDP | 2009 |
ELEKTROPRIVREDA BIH | Tuzla, BIH | Investment and environmental documentation for new energy facilities in TPP, unit 7 | IP, IR | 2009 |
ELEKTROPRIVREDA CRNE GORE | Nikšič, MNE | Preliminary design documentation and feasibility study of construction for TPP | IDP | 2009 |
METAL RAVNE | Ravne | Project documentation for blooming WWTP | PZI | 2010 |
ACRONI | Jesenice | Project documentation for construction of 2 compensatory devices | IDZ, PGD,PZI | 2010 |
ELEKTRO LJUBLJANA | Ljubljana | Project documentation for WWTP 110/35-20kV Litostroj | PID | 2010 |
EP REPUBLIKE SRBSKE | Ugljevik, BIH | Project documentation for reconstruction waste water treatment plant at thermal power plant Ugljevik | IDP, PZI, PID, NOV | 2010/2011 |
ACRONI | Jesenice | Project documentation for leaching bath 3 | PZI, PID, NOV | 2010 |
ACRONI | Jesenice | Project documentation for washing drying line | PZI, PID, NOV | 2010 |
PETROL ENERGETIKA | Štore | Pproject documentation own use and replacement CTP Štore | PZI, PZR | 2010 |
METAL RAVNE | Ravne na Koroškem | Project documntation for transformer station in a new production hall EPŽ waste water treatment plant | PZI | 2011 |
PREMOGOVNIK VELENJE | Velenje | Project documentation for clean mine water from water wells | IDZ | 2011 |
ACRONI | Jesenice | Calculation for water cooling system EOP | preračuni | 2011 |
ACRONI | Jesenice | Project documentation PGD,PZI,PID,NOV for modernization framework Blooming | PGD, PZI, PID, NOV | 2011 |
ELEKTRO CELJE | Celje | Project design for 110/20 kV TS switchyard Žalec | IDZ, PGD, PZR, PZI, PID | 2011 |
ACRONI | Jesenice | Project documntation for 4. storage space | IDZ, PZI | 2011 |
PETROL ENERGETIKA, PE ENERGETIKA ŠTORE | Štore | Project documentation for energy corridor KJ6 | PGD,PZI, PID | 2011 |
ARCELOR MITTAL ZENICA | Zenica, BIH | Preliminary design documentation for complete system collection, trnasport and treatment of waste water | IDP | 2011 |
AD ČAJAVEC-MEGA | Banja luka, BIH | Preliminary design of TS Banja luka | IDP | 2011 |
METAL RAVNE | Ravne | Project documentation for the new production hall | IDZ, PGD, PZR, PZI, PID, NOV | 2011 |
OBČINA MOZIRJE | Mozirje | Project documentation for WWTP reconstruction | IDZ, PGD | 2012 |
PETROL ENERGETIKA, PE ENERGETIKA ŠTORE | Štore | Project documentation for WWTP reconstruction | IDZ, PGD, PZI | 2011 |
MESTNA OBČINA CELJE | Celje | Project documentation for WWTP reconstruction | PZI | 2011 |
MESTNA OBČINA CELJE | Celje | Project documentation for new pumping station Frankolovo | PZI, PID, NOV | 2011 |
KLINIČNI CENTER / IMP PROMONT | Ljubljana | Project task and analysis for drinking water HAZOP | PN | 2011 |
RAZNI KUPCI | različne lokacije | Project documentation for solar power plant, including with start up | PGD, PZI | 2011 |
TE ŠOŠTANJ | Šoštanj | Project documentation for flue gas desulphurisation, unit 6 | PGD, PZI, PID, NOV | 2011/2013 |
OBČINA MOZIRJE | Mozije | Project documentation for reconstruction of waste water treatment plant Mozirje | IDP, PZI | 2011/2012 |
KOTO | Ljubljana | Project documentation for new biogas plant | PZI | 2011/2012 |
DEM | Vuzenica | Project documnetation for lock reconstruction on hydro power plant Vuzenica | PZI, PID, NOV | 2011/2012 |
PREMOGOVNIK VELENJE | Velenje | Project documentation mine water celaning from the pumping station with its own water treatment plant | IDZ | 2011/2012 |
ACRONI | Jesenice | Project documnetation for upgrading waste water treatment plant in steel plant | IDP | 2012 |
AGRO KOTO | Zagreb | Project documentation for biogas plant (technology) | IDP | 2012 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Project design documentation for unit 6 TPP - mechanical installation | PGD, PZI, PID | 2012 |
TE ŠOŠTANJ | Šoštanj | Project documnetation for water treatment, unit 6 power 600MW | PZI, PID, NOV | 2012-2013 |
TE ŠOŠTANJ | Šoštanj | Project documnetation for amomonia water treatment, unit 6 power 600MW | PZI, PID, NOV | 2012-2013 |
MESTNA OBČINA VELENJE | Velenje | Project documentation, - Drinking eater supply in Šaleška dolina | PGD, PZI, PID, NOV | 2012-2014 |
METAL RAVNE | Ravne | Preliminary design documentation for TS reconstruction | IDP | 2013 |
ESOTECH SOLUTIONS | Velenje | Preliminary design documentation for thedrinking water production- softener system (Sremska Mitrovica) | IDP | 2013 |
ACRONI | Jesenice | Project documentation for replacement of pickling bath 1 | IDZ,PGD,PZI, PID,NOV | 2013 |
PSIHIATRIČNA BOLNIŠNICA VOJNIK | Vojnik | Project documentation prepraration,building permit, Authorization and implementation of construction and craft works for underground connection corridor and new TS | PGD,PZI | 2013 |
OBČINA SREMSKA MITROVICA | Sremska Mitrovica, SRB | Project documentation for drinking water facilities | IDP | 2013 |
MESTNA OBČINA CELJE | Celje | Project documentation for reconstruction of WWTP Škofja vas | IDZ,PGD,PZI, PID,NOV | 2013 |
COLT INTERNATIONAL | Šoštanj | Project documentation for heating,boiler room ventilation and fan room, unit 6 TPP Šoštanj | PZI, PID, NOV | 2013-2014 |
OBČINA ŠOŠTANJ | Šoštanj | Project documentation for nursery | PGD, PZI, PID, NOV | 2013-2014 |
METAL RAVNE | Ravne na Koroškem | Project documentation of technology new vacuum furnace | IDZ,PGD,PZR,PZI, PID, NOV | 2013-2014 |
OBČINA MAKOLE | Makole | Project documentation for project of drinking water supply in the basin of river Dravinja, Part 3 | PZI, PID, NOV | 2013-2014 |
OBČINA GRAD | Grad | Project documentation for project of drinking water supply in Prekmurje region, Part 1 | PZI, PID, NOV | 2013-2014 |
OBČINA JESENICE | Jesenice | Sewer construction works, reconstruction and upgrade of central waste water treatment plant at municipality Jesenice- construction of tertiary Jesenice 30000 PE | PGD, PZI | 2013-2015 |
METAL RAVNE | Ravne na Koroškem | Project documentation for reconstruction of transformer substations | PGD, PZI, PID, NOV | 2014 |
KOMUNALA SLOVENJ GRADEC | Slovenj Gradec | Preparation of project documentation for the preparation and processing of raw water in the reservoirs in Suhi dol | IDZ, IDP | 2014 |
ACRONI | Jesenice | Project documentation - line for heat treatment of heavy plates | PGD,PZI,PID | 2014 |
ADRIA GRADNJE | Ljubljana | Project documentation for relocation DV2x400kV Beričevo-Okroglo | IDP | 2015 |
FORI | Velenje | Project documentation for an extension to the existing building | IDZ,PGD,PZI,PID | 2015 |
METAL RAVNE | Ravne na Koroškem | Project documentation for TP EPŽ IV and reconstruction of TP Mechanical workshop | IDP,PGD,PZI | 2015 |
ELEKTROPRIVREDA SRBIJE | Obrenovac, SRB | Preparation of project documentation for the construction and commissioning of waste water in TPP Nikola Tesla | IDP,PZI,DDI | 2014/2017 |
MESTNA OBČINA NOVO MESTO | Novo mesto | Construction of Water treatment Plant, Hydraulic improvement of potable water supply system in central Dolenjska | PGD, PZI | 2015-2016 |
OBČINA MOZIRJE | Mozirje | Implementation works on the treatment plant PE 6000 | PGD, PZI | 2015-2016 |
MESTNA OBČINA VELENJE | Velenje | Project documentation - ski jumping K 55 and K 35 | PGD | 2015 |
OBČINA PLJEVLJA | Pljevlja, MNE | Pljevlja District Heating Project | IDP | 2016 |
ELEKTROPRIVREDA CRNE GORE | Nikšič, MNE | Preliminary design documentation of construction for TPP Pljevlja II | IDP | 2016 |
ELEKTRO CELJE | Vojnik | Project documentation and design control - DTS Vojnik | IDZ, PGD, DZR, PZI, PID | 2016-2017 |
ELEKTRO MARIBOR | Dobrava | Project documentation - DTS Dobrava | PZI, PID, RD | 2017 |
METAL RAVNE | Ravne na Koroškem | Project documentation for reconstruction TS | PGD,PZI | 2017 |
HESS | Spodnja Sava | Preparation of the study of the technical solution | Tehnična rešitev | 2017 |
ISTARSKI VODOVOD | Sv. Ivan, HRV | Preparation of project documentation for the reconstruction of the pumping station and TS | Projektiranje | 2017-2018 |
METAL RAVNE | Ravne na Koroškem | Project documentation for TP EPŽ 4 - Preparation of conceptual design, for construction permit, for implementation | IDZ, PGD, PZI | 2017-2018 |
ELEKTRO CELJE | Krško | Project documentation for three facilities in the distribution unit Krško. | PGD, PZI, PID | 2018 |
JAVNO PODJETJE KOMUNALA SLOVENJ GRADEC | Slovenj Gradec | Project documentation DGD (for construction permit) and list of works for implementation for boiler house on wood biomass | DGD | 2019 |
ELEKTRO MARIBOR | Maribor | Project documentation for DTS Lenart and DTS Ljutomer | RD, PZI, PID | 2019 |
JEKO | Jesenice | Preparation of project documentation (Regulation of technological water for internal use of central water treatment plant Jesenice) | PZI | 2019 |
HSE INVEST | Maribor | Preparation of project documentation for the implementation of the new heat station in B6 | PZI | 2019 |
KOMUNALNO PODJETJE VELENJE | Velenje | Preparation of project documentation of lightning protection at central water treatment plant Velenje | PID | 2019 |
SIJ METAL RAVNE | Ravne na Koroškem | Preparation of project documentation for TP Nova Jeklarna 3 | IZP | 2019 |
SIJ ACRONI | Jesenice | Preparation of project documentation for relocation of energy kinetics and pipelines in the field od PDP | DGD, PZI, PID, POV | 2019 |
ELEKTRO MARIBOR | Maribor | Preparation of project documentation for DTS Lenar and DTS Ljutomer | RD, PID, PZI | 2019 |
JAVNO PODJETJE KOMUNALA SLOVENJ GRADEC | Slovenj Gradec | Preparation of project documentation for boiler house on wood biomass | PZI | 2019 |
SIJ METAL RAVNE | Ravne na Koroškem | Preparation of project documentation | IZP, PZI | 2019 |
OBČINA MISLINJA | Mislinja | Preparation of project documentation for reconstruction of ski jump HS 65 in Mislinja | PZI | 2019 |
JP ELEKTROPRIVREDA BiH d.d. - SARAJEVO | Kakanj, BIH | Innovation services for investment-technical and environmental documentation of replacement Unit 8 at TPP Kakanj | IZP | 2019/2020 |
Javno podjetje KOMUNALA SLOVENJ GRADEC, d.o.o. | Slovenj Gradec | Preparation of PZI documentation | PZI | 2019/2020 |
STEKLARNA HRASTNIK | Hrastnik | Preparation of technological design | IZP | 2020 |
ZAVOD INŠTITUT ZA DALJINSKO ENERGETIKO | Kosovo, KOS | Preparation of DGD/PZR project documentation for Obilič Kosovo | DGD, PZR | 2019 |
SIJ ACRONI | Jesenice | Preparation of IZP, DGD, PZI, PID, NOV for steel waste storage | IZP, DGD, PZI, PID, NOV | 2020-2021 |
ELEKTRO MARIBOR | Maribor | Preparation of project documentation for DTS Ormož and DTS Rače | RD, PZI, PID | 2020-2021 |
SIJ METAL RAVNE | Ravne na Koroškem | Preparation of IZP, DGD, PZI, PID, NOV TS "Nova Jeklarna 3" | IZP, DGD, PZI, PID, NOV | 2020-2021 |
ELEKTRO PRIMORSKA | Vrtojba | Preparation of project doc. for the renovation of the 20 kV switchyard DTS Vrtojba | IZP, DGD, PZI, DZR, PID | 2020-2021 |
projects in thermo and hydro power plants[283kB ]
PROJECTS IN THERMO AND HYDRO POWER PLANTS
Investor | Location | Project | Year |
TERMOELEKTRARNA PLOMIN | Plomin, HRV | Electrification and automation of the transport system | 1992 |
TERMOELEKTRARNA TOPLARNA LJUBLJANA | Ljubljana | District heating plant-electrification of the coal transport and unloading system | 1995 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Revamping and upgrading of hydro power plants on the Drava; deinstallation and installation of Kaplan turbines with a total power of 20,49 MW, generator sets, trensformer stations 10/110 kV, medium and high voltage switching stations and corresponding construction works | 1995-1999 |
DRAVSKE ELEKTRARNE MARIBOR | Vuzenica | Revamping and upgrading of hydro power plants on the Drava; deinstallation and installation of Kaplan turbines with a total power of 20,49 MW, generator sets, trensformer stations 10/110 kV, medium and high voltage switching stations and corresponding construction works | 1995-1999 |
DRAVSKE ELEKTRARNE MARIBOR | Dravograd | Revamping and upgrading of hydro power plants on the Drava; deinstallation and installation of Kaplan turbines with a total power of 20,49 MW, generator sets, trensformer stations 10/110 kV, medium and high voltage switching stations and corresponding construction works | 1995-1999 |
DRAVSKE ELEKTRARNE MARIBOR | Dravograd | Horizontal rib in the suction pipe of the unit no.3 | 1998 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Design and production of multi-purpose inflow turbine gates | 1998-1999 |
DRAVSKE ELEKTRARNE MARIBOR | Dravograd | Horizontal rib in the suction pipe of the unit no.1 | 1999 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Reconstruction of the hydro-mechanical gate | 1999 |
SOŠKE ELEKTRARNE NOVA GORICA | Plave | General overhaul of the generator set 2 (B) with a power of 11 MW | 1995 |
SOŠKE ELEKTRARNE NOVA GORICA | Plave | General overhaul of the generator set 2 (A) with a power of 11 MW | 1999 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Electrical installation works during the overhaul of units 4 and 5 | 1992-1998 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Reconstruction of the 110 kV switching station | 1994 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Design and installation of the DC distribution for units no. 1, 2 and 3 - reconstruction | 1994 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Electrical installation works during construction of ODP4 - electrification of 0,4 kV and 10 kV switching stations | 1994 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of power systems, design and performing of electrical works | 1995-1999 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Pneumatic transport of ash - design and electrification | 1997 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of hydraulic control at units no. 1 and 2 | 1997 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of steam conduit at units no 1 and 2 | 1997 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Design of electric installation for feeding pumps at all units | 1997 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Power connections at 6 and 10 kV coils | 1997 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Design, supply and installation of NN distribution for internal consumption of the units 1 and 2 | 1997 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Design and installation of electrical equipment for unit 5 | 1997 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Boiler overhaul: fitting of new oil gas burners at unit 4 | 1998 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Mechanical overhaul at units 4 and 5: overhaul of coal distributors, smoke channels, low temperature heat exchangers, air heaters LUVO | 1998 |
DRAVSKE ELEKTRARNE MARIBOR | Formin | Modification of control system - phase 2. | 1998 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of the piping in the superheater 2 in the unit 5 boiler | 1999 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Installation of the pipe heat exchanger in the unit 5 boiler | 1999 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Connection of the vacuum filter mixing chamber and the interim storage to the existing information network of thermal power plant Šoštanj | 1999 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Design, supply and installation of inflow gates | 1999 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Combined heat and power production at the unit 5 | 1999-2000 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Desulphurization of flue gases at unit 5 - flue gas channels | 1999-2000 |
TERMOELEKTRARNA TRBOVLJE | Trbovlje | Yearly maintenance works at electrical and mechanical equipment: transportation systems, crushing, milling, combustion and pressure parts of boilers, draughts and fans, electrostatic precipitators, desulphurization plant | 2000 |
TERMOELEKTRARNA BRESTANICA | Brestanica | Calibration, low voltage distribution network | 2000 |
TERMOELEKTRARNA BRESTANICA | Brestanica | Installation of diesel power generation units | 2000 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Yearly maintenance works at electrical and mechanical equipment: transportation systems, crushing, milling, combustion and pressure parts of boilers, draughts and fans, electrostatic precipitators, desulphurization plant | 2000 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Revamping and upgrading of hydro power plants on the Drava | 1995-2000 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of the secondary superheater in the unit 5 boiler | 1999 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of the fresh steam conduits at units no. 1, 2 and 3 | 1998-1999 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Constructural equipment ODP 5 - electrical and mechanical equipment | 1999-2000 |
SOŠKE ELEKTRARNE NOVA GORICA | Nova Gorica | Installation of the generator sets at hydro power plants Plave II and Doblar II | 2000-2001 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of power systems at units 1-5 at the Šoštanj thermal power plant; yearly contract | 1999-2003 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance works at units for transport of ash and slag | 2001 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of pressure parts of energetic systems | 2001 |
TERMOELEKTRARNA TOPLARNA LJUBLJANA | Ljubljana | Installation and partly supply of equipment for replacement of the exciter system for the turbine unit no.3 | 2002 |
TERMOELEKTRARNA TOPLARNA LJUBLJANA | Ljubljana | Electrical works on the electrostatic precipitator 3 | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Supply and installation of equipment for the reconstruction of slag transport system at unit 5 | 2002 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Dismantling and installation works during replacement of conductor at the Ožbalt hydro power plant | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of steam conducts RB 10 and RB20 at the unit no.4 at Šoštanj thermal power plant | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Reconstruction of a mill gate | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of ash transportation equipment at Šoštanj thermal power plant | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of power systems at units 1 - 5 at Šoštanj thermal power plant - electrical works | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of pressure parts of energetic systems | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Reconstruction of secondary air channels | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Overhaul of coal distributors | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | VVelding and maintenance works as well as suppression of breakdowns and interventions at units 1, 2, 3, 4 and 5 | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Remediation of the oxidation air distribution system at RDP 4 | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of the high pressure reduction station at unit 4 | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Remediation of air heaters NH1 and NH2 at unit 4 | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Installation of heat insulation at flue gas channels over the air heater | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Refit of reducing station Sulzer on unit 4 | 2002 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Lighting and small consumption for the auxiliary rooms at Vuhred hydro power plant | 2003 |
DRAVSKE ELEKTRARNE MARIBOR | Ožbalt | Dismantling and installation works at replacement of pre-leader on agregate no. 3 | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Installation of heat insulation at flue gas channels over the air heater | 2002 |
TERMOELEKTRARNA TOPLARNA LJUBLJANA | Ljubljana | Reconstruction of the cleaning machine | 2003 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | VVelding and maintenance works as well as suppression of breakdowns and interventions at unit 4 | 2003 |
DRAVSKE ELEKTRARNE MARIBOR | Formin | Replacement of 110kV cable line | 2003-2004 |
SAVSKE ELEKTRARNE LJUBLJANA | Medvode | Execution of low voltage switching units | 2004 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of pressure parts of energetic systems | 2004 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance works at units for transport of ash and slag | 2004 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of energetic systems - electro | 2004 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Supply of steel transporter | 2004 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Reconstruction of slag transport | 2004 |
DRAVSKE ELEKTRARNE MARIBOR | Ožbalt | Project of renewal of HPP on drava 2. phase. Deinstallation and installation of Kaplan turbines, generator sets, auxilary equipment, electro equipment, with corresponding construction works | 2001-2005 |
DRAVSKE ELEKTRARNE MARIBOR | Vuhred | Project of renewal of HPP on drava 2. phase. Deinstallation and installation of Kaplan turbines, generator sets, auxilary equipment, electro equipment, with corresponding construction works | 2001-2005 |
SAVSKE ELEKTRARNE LJUBLJANA | Medvode | Renewal of HPP Medvode. Dismantling and installation of turbines with auxilary mechanical equipment and generator, agregate 2. | 2003-2005 |
SAVSKE ELEKTRARNE LJUBLJANA | Medvode | Renewal of HPP Medvode. Supply and erection of electro equipment. | 2003-2005 |
HOLDING SLOVENSKE ELEKTRARNE | Boštanj | L0T EA - delivery, erection and connection of auxilary electro equipment on HPP Boštanj | 2004-2006 |
TE TOL | Ljubljana | Mechanical refit on pressure part of boiler and repair of boiler fittings | 2005 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Yearly maintenance of electro systems | 2005 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of pressure parts of energetic systems | 2005 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance works at units for transport of ash and slag | 2005 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of energetic systems - electro | 2005 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of final overheater P3 | 2005 |
TERMOELEKTRARNA TRBOVLJE | Trbovlje | Reconstruction of electrification for electro filter on unit 4 | 2005 |
TERMOELEKTRARNA TRBOVLJE | Trbovlje | Replacement of heat isulation on steam conduit of re-heated steam | 2005 |
TERMOELEKTRARNA TRBOVLJE | Trbovlje | Tighten reconstruction on air heater | 2005 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance works on coal allocation of unit 4 | 2005 |
RADE KONČAR | Vuhred | Sanitation of deviation of rotor/stator rounding for HPP Vuhred | 2005 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Repair of cavitation damages on driving gear, lining and discharge unit og agregate 1 HPP Formin | 2006 |
TE TOL | Ljubljana | Modification of de-slager K1 | 2006 |
TE TOL | Ljubljana | Main steam conduit erection | 2006 |
TE TOL | Ljubljana | Erection of heaters for water network | 2006 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Mainteinance works on electroenergetical installation | 2006 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of ash pipeline and execution of segment angles | 2006 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Electrical works for new gas turbines | 2007 |
LITOSTROJ E.I. | Krško | HPP Krško LOT T turbine assembly and auxiliary hardware assemby | 2007-2009 |
ALSTOM | Krško | HPP Krško LOT T preassembly and assembly generator equipment | 2009 |
KONČAR - KET | Blanca | generator pipeline cooling system manufacturing at HPP Blanca | 2009 |
TERMOELEKTRARNA TRBOVLJE | Trbovlje | Reconstruction of sealing air heater | 2009 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of energy facilities, unit 1-5 | 2009-2012 |
RUDIS TRBOVLJE | Doblar | HPP Doblar reconstruction works, deassembly and assembla of new equipment | 2009-2013 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement outdoor lighting on coal depo | 2010 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Supply and installations of safe cells | 2010 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Cable connection for the transmission of RF transmission line between the criterion of protection and new telecommunications space | 2010 |
KONČAR – GENERATORI I | Boštanj | Repair of aggregate No. 3 at HPP Boštanj | 2010 |
LITOSTROJ POWER | Zlatoličje | HPP Zlatoličje, deassembly and assembly of equipment | 2010 |
LITOSTROJ POWER | Zlatoličje | Rehabilitation of the carrier bearing aggregate | 2010 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of energy facilities | 2010-2012 |
GORENJE | Doblar | Renovation works of HPP works Doblar 1 LOT EE | 2010-2013 |
KONČAR-GENERATORI I | Boštanj | Repair works on HPP Boštanj No.1 | 2011 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Revision of the air heaters in the A and B unit 5 | 2011 |
SIEMENS | Šoštanj | Replacing the generator of unit 5 in TPP | 2011 |
ALSTOM POWER SYSTEMS | Šoštanj | The anchor manufacture and supply for unit 6 | 2011 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Heating water modification to regenerate the TPP Šoštanj phase II. | 2011 |
RIKO | Ljubljana | Installation of generator equipment Sv. Petek Macedonia | 2011 - 2012 |
DRAVSKE ELEKTRARNE MARIBOR | Vuzenica | Gate No. 4 renovation works at HPP Vuzenica | 2011-2012 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of energy facilities | 2011-2012 |
ELEKTROPRIVREDA REPUBLIKE SRBSKE | Bočac, BIH | Reconstruction works of cooling system at HPP Bočac | 2012 |
DRAVSKE ELEKTRARNE MARIBOR | Zlatoličje | Renovation Outdoor lighting | 2012 |
DRAVSKE ELEKTRARNE MARIBOR | Dravograd | 110kV busbar differential protection HE Dravograd - supply of equipment and installation | 2012 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of energy facilities, unit 3-5 | 2013 |
DRAVSKE ELEKTRARNE MARIBOR | Dravograd | Renovation of operating spillway gate on HPP Dravograd | 2012-2013 |
DRAVSKE ELEKTRARNE MARIBOR | Fala | Overhaul of the propulsion mechanisms operating locks spillways 3 and 4 Fala HPP | 2012-2013 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance works on electrical equipment in TPP | 2012-2013 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Building installation on B6 | 2012-2015 |
DRAVSKE ELEKTRARNE MARIBOR | Vuzenica | Renovation hardware operating locks spillways 1 and 3 HE Vuzenica | 2013-2014 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance of energy facilities, unit 3-5 | 2013 |
LITOSTROJ POWER | Weinzodl, AUT | Reconstruction on HPP Weinzodl | 2013-2015 |
DRAVSKE ELEKTRARNE MARIBOR | Vuzenica | Renovation hardware operating locks spillways 1 and 3 HE Vuzenica | 2013-2015 |
LITOSTROJ POWER | Brežice | Installation of turbine equipment and auxiliary systems in new buildings in HE Brežice | 2013-2017 |
DRAVSKE ELEKTRARNE MARIBOR | Zlatoličje | Upgrading the cooling system in the aggregate 2 in HE Zlatoličje | 2014-2015 |
DRAVSKE ELEKTRARNE MARIBOR | Vuzenica | Replacing the turbine to the grid unit 3 HPP Vuzenica | 2015-2016 |
DRAVSKE ELEKTRARNE MARIBOR | Melje | Renovation aggregate 2 small HP Melje | 2016 |
KONČAR-GENERATORI | Brežice | Installation of generator equipment and auxiliary systems in new HPP Brežice | 2015-2017 |
TE BRESTANICA | Brestanica | Construction of new gas turbines 40-70 MW for TPP Brestanica LOT 3 - auxiliary technological systems | 2017 |
SAVSKE ELEKTRARNE LJUBLJANA | Vrhovo | HPP Vrhovo overflow filed no. 5 | 2017 |
TE PLOMIN | Plomin, HRV | Reconstruction of the lamination depositor | 2017 |
KORONA | Doblar | Reconstruction hydromechanical equipmennt HPP Doblar 1, water dam Podselo | 2017 |
ELEKTROPRIVREDA REPUBLIKE SRPSKE | Ugljevik, BIH | Procurement of services of maintenance (repair) and improvement of the industrial WTP (Ugljevik) | 2017 |
Kolektor IGIN | Vrhovo | Renewal of the system for managing aggregates, excitation and own consumption of HPP Vrhovo | 2017 - 2018 |
DRAVSKE ELEKTRARNE MARIBOR | Vuzenica | Repair of the servomotor of the VZ1 guide | 2017 - 2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Upgrading of the heat station in unit 6 of the Šoštanj Thermal Power Plant | 2017-2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of the system of counting measurements of accounting and control measuring points | 2017-2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenance works on electrical equipment in TPP | 2017-2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Repair and maintenance of the heating system of unit 5 | 2018 |
Rudnik uglja A.D. Pljevlja | Pljevlja, MNE | Execution of works on reconfiguration and modernization of the DTO system - Phase 1 | 2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintenace work and repair of unit 5 in the area of coal transport and transport of the product | 2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Supply and installation of the steam subblower of the unit 6 in thermal power plant Šoštanj | 2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintance work during the repair of unit 6 | 2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Implementation of maintenance services of the transport product | 2018-2019 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Rebuilding of flue gas duct | 2018 |
DRAVSKE ELEKTRARNE MARIBOR | Fala | Replacement of shutt-off valves of operating spillway gate 3 of the Fala HE | 2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Reconstruction of high-voltage and low-voltage power supply | 2018 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Overhaul of the operating gate of the flow field 3 HE Ožbalt | 2019 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Replacement of shutt-off valves of operating spillway gate 4 of the Fala HE | 2019 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Maintance work during the repair of block 6 | 2018 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Moisturizing the product at a transitional landfill | 2019 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacing LUVO Block 5 Heating Packs | 2019 |
TERMOELEKTRARNA BRESTANICA | Brestanica | Production, supply, installation, testing and commissioning of auxiliary technological systems - LOT 3 within the project "Construction of gas blocks 40-70 MW in TPP Brestanica, PHASE 1B" | 2020 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Welding services | 2020 |
DRAVSKE ELEKTRARNE MARIBOR | Maribor | Overhaul of the operating gates of the flow fields HE Ožbalt and HE Fala | 2020-2021 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Supply of goods and performance of services for overhaul of Unit 6, part 3, LOT 3 | 2020-2021 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Supply of goods and performance of services for overhaul of Unit 6, part 6, LOT 1, 2, 3, 5 | 2020-2021 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Supply of goods and performance of services for overhaul of boiler, turbine and generator piping of Unit 6, part 1, part 2, LOT 2 | 2020-2021 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Replacement of catalyst packages in the DeNOx reactor and revision of the EF at Unit 6 | 2021 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | | 2021 |
TERMOELEKTRARNA BRESTANICA | Brestanica | | 2021 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | | |
solar power plant[242kB ]
SOLAR POWER PLANT
Investor | Location | Project | Year |
EUROCITY | Otiški Vrh | Solar power plant 700 kWp | 2011 |
PUŠNER | Nazarje | Solar power plant 14,7 kWp design, assembly and start up | 2011 |
ESOTECH | Velenje | Solar power plant 380 kWp | 2011 |
Herman Hrustel | Mislinja | Solar power plant 15 kWp - design, assembly and start up | 2011 |
Branko Naveršnik | Mislinja | Solar power plant 15 kWp - design, assembly and start up | 2011 |
Franc Šilak | Mislinja | Solar power plant 8 kWp - design, assembly and start up | 2011 |
AVTOSERVIS | Slovenj Gradec | Solar power plant 49,3 kWp and 35,8 kWp - design, assembly and start up | 2012 |
VOLTAIKA | Slovenj Gradec | Solar power plant 49,9 kWp - design, assembly and start up | 2012 |
KOCEROD | Šmartno pri Slovenj Gradcu | Solar power plant 115 kWp - design, assembly and start up | 2019 |
UNIVERZA V LJUBLJANI | Ljubljana | Solar power plant 70 kWp - design, assembly and start up | 2019 |
Janez Turinek | Velenje | Solar power plant 11 kWp - design, assembly and start up | 2020 |
civil construction[243kB ]
CIVIL CONSTRUCTION
Investor | Location | Project | Year |
ACRONI | Jesenice | Execution works and equipment installation, design and technical documentation for the project | 2008-2009 |
OBČINA ŠOŠTANJ | Šoštanj | Construction of a recreational and cultural centre in Ravne | 2009-2010 |
RCE | Velenje | Building renovation | 2012 |
BOLNIŠNICA TOPOLŠICA | Šoštanj | Energy rehabilitation of hospital buildings in Topolšica | 2012-2014 |
ŠOLSKI CENTER RAVNE NA KOROŠKEM | Ravne na Koroškem | Energy rehabilitation of school centre in Ravne, 1st. Stage | 2013 |
OBČINA ŠOŠTANJ | Šoštanj | Construction of a nursery plant in Šoštanj - concession | 2013-2028 |
OBČINA ILIRSKA BISTRICA | Ilirska Bistrica | Construction of a central nursery plant in Ilirska Bistrica - Phase 3 | 2015-2016 |
MESTNA OBČINA VELENJE | Velenje | Reconstruction of Business Centre Standard | 2015 |
OBČINA LJUBNO | Ljubno ob Savinji | Ski-jumping hill | 2015 |
MESTNA OBČINA VELENJE | Velenje | Ski-jumping hill | 2016 |
OBČINA BOVEC | Bovec | Sanitation of the street section Mala vas – Dvor | 2018 |
OBČINA MISLINJA | Mislinja | Construction of the center for helath and sport Mislinja, with all environmental aspects | 2018 |
OBČINA ŠOŠTANJ | Šoštanj | Reconstruction and addition of Music school Šoštanj | 2018-2019 |
ELES | Podlog | Arrangement of business area in Podlog | 2018-2019 |
MESTNA OBČINA VELENJE | Velenje | Public-Private partnership for construction of nursery Vinska Gora | 2018-2033 |
MESTNA OBČINA VELENJE | Velenje | Construction of civil works for the CTN project revitalization of the Old Town center | 2020-2021 |
MESTNA OBČINA VELENJE | Velenje | Energy renovation of building Ljudska univerza Velenje | 2020 |
OBČINA VERŽEJ | Veržej, Kobilje, Radenci | Granting a concession for the implementation of an energy contracting project for the comprehensive energy renovation of buildings | 2020-2035 |
video conference systems[241kB ]
VIDEO CONFERENCE SYSTEMS
Investor | Location | Project | Year |
KLINIČNI CENTER | Ljubljana | Design of mechanical and electrical installations and video conference system as well as architectural design - large convention hall | 2000 |
ZVEZNA UPRAVA CARINE ZRJ | Beograd, SRB | Video conference IP connection of twelve business units of the Federal Customs Administration of the FR Yugoslavia with the implementation of the Accord multi point unit | 2000 |
UNIVERZA V MARIBORU | Maribor, Celje | Video conference IP connection between the premises of the Faculty of civil engineering in Maribor and Celje | 2000 |
UNIVERZA V MARIBORU | Maribor | Audio/video equipment for the remote studies lecture room at the Faculty of civil engineering, University of Maribor | 2000 |
FAKULTETA ZA GRADBENIŠTVO, UNIVERZA V LJUBLJANI | Ljubljana | Video conference equipment | 2000 |
INSTITUT JOŽEF STEFAN | Ljubljana | Video conference equipment | 2000 |
GRAMMER AVTOMOTIVE SLOVENIJA | Slovenj Gradec | Video conference equipment | 2000 |
GORENJE | / | ISDN video conference connection of Gorenje d.d. business units in Germany, Austria, Italy, France, Denmark, Russia, Czech republic, Poland, Yugoslavia, Bosnia, Croatia and Slovenia | 2001 |
MESTNA OBČINA VELENJE | Velenje | Live transmission of events from the municipali-y of Velenje through internet and a local TV channel | 2001 |
DELOITTE&TOUCHE | Ljubljana | Software for registered users within the "20 key" project | 2001 |
FAKULTETA ZA ORGANIZACIJSKE VEDE KRANJ | Kranj | Video conference equipment | 2001 |
ARNES | Ljubljana | Video conference equipment | 2001 |
DOMEL | Železniki | Video conference equipment | 2001 |
SGA | Slovenjske Konjice | Video conference equipment | 2001 |
S. OLIVER | Maribor | Video conference equipment | 2001 |
UNIVERZA V MARIBORU | Maribor | Technical support for the internet video conference within the UNESCO "Science for peace" event | 2001 |
FAKULTETA ZA ORGANIZACIJSKE VEDE KRANJ | Kranj | Video conference between Bled and Washington | 2001 |
KUJT E SA INTERNET SERVICES, KOSOVO | Priština, KOS | Video conference system | 2002 |
CENTER VLADE ZA INFORMATIKO | Ljubljana, Bruselj | ISDN connection between the governmental information technology center amd a location in Brussels with video conference and other multimedia equipment and data encription | 2002 |
UNIVERZA V TUZLI | Tuzla, BIH | Conception and supply of the lecture room video conference equipment at the Faculty of eletrotechnics | 2002 |
UNIVERZA V MARIBORU | Maribor | Mobile video conference unit at the Faculty of electrotechnics, computer and information science | 2002 |
MESTNA OBČINA NOVA GORICA | Nova Gorica | Multimedia equipment with a video conference svstem in the crystal hall of the municipality of Nova Gorica | 2002 |
GORENJE | Velenje | Video conference equipment and audio/video equipment of a conference room | 2002 |
SOFTNET | Ljubljana | Video conference equipment | 2002 |
GORENJE | Velenje | Video conference svstem ISDN/IP | 2002 |
UNISTAR | Ljubljana | Cruiser video conference svstems | 2003 |
UNIVERZA V MARIBORU | Maribor | Equipment of a multimedia classroom | 2003 |
ARNES | Ljubljana | Vigo mobile video conference system | 2003 |
ARNES | Ljubljana | Multipoint unit (MCU) including a gateway and maintenance | 2003 |
MŠZŠ | Ljubljana | Equipment of 27 education facilities with Falcon video conference svstems | 2004 |
ARNES | Ljubljana | Starbak streaming equipement and maintenance | 2004 |
TRIGLAV | Ljubljana | Multipoint unit (MCU) including a gateway and 13 Group video conference systems | 2005 |
UNIVERZA V MARIBORU | Maribor | Video conference equipment - software | 2006 |
INSTITUT JOŽEF STEFAN | Ljubljana | Video conference equipment - software | 2006 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Telecommunications hub gears | 2009-2010 |
| | | |
surveillance[225kB ]
SURVEILLANCE
Investor | Location | Project | Year |
KAMNOLOM PAKA | Velenje | Video surveillance with analog encoding | 1998 |
ŠTAJERSKI AVTODOM | Maribor | Video surveillance | 1999 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Video surveillance (optical equipment) | 1999 |
ELEKTRONIKA VELENJE | Velenje | Video surveillance with ISDN communication and digital encoding | 1999 |
VARNOST PRIVA | Brestanica | Technical protection of the thermal power plant Brestanica | 2002 |
TERMOELEKTRARNA ŠOŠTANJ | Šoštanj | Video surveillance (optical equipment) | 2004 |
telemedicine and distance learning[238kB ]
TELEMEDICINE AMD DISTANCE LEARNING
Investor | Location | Project | Year |
ESOTECH | Ljubljana | Video conference system at the gastroscopical department of the Ljubljana Clinical Centre and an IP connection with the lecture room as well as an ISDN outside connection | 2000 |
IZOBRAŽEVALNO SREDIŠČE MIKLOŠIČ | Ljubljana | Video conference equipment | 2000 |
JEZIKOVNA ŠOLA PANTEON | Ljubljana | Video conference equipment | 2000 |
|