|
Signing of the Contract for "Automation of MV Distribution Network Loops – GreenSwitch" - LOT 2: Protection and Control Terminals |
July 2024:
In June 2024, we signed a contract with the client Elektro Celje, d.d. for the supply of goods within the project "Automation of MV Distribution Network Loops – GreenSwitch" - LOT 2: Protection and Control Terminals. The subject of the supply includes protection and control terminals for MV cells operating in a loop, protection and control terminals for MV cells operating in radial mode, and software for configuring, parameterizing, and setting up devices. As part of this project, we will also produce standard equipment configurations according to the client's specifications.
The supply of goods under this public procurement is (co)financed by the EU GreenSwitch project. The quantities are planned for a two-year period, and the equipment and services must meet both the minimum general and additional requirements.
|