Esotech successfully delivered a purifying plant for dross pits and a slime processing structure |
Velenje, January 31st, 2008:
Esotech
has, successfully and within the framework of contracting term, delivered the
biggest structure for the customer – Acroni – a purifying plant for dross pits
Blooming and Steckel and a slime processing structure. In Esotech, we successfully and within specified
time period delivered the largest structure – a purifying plant for dross pits
Blooming and Steckel in December 2007. We made PZI project documentation,
accomplished building works, delivered and synchronized the equipment.
The new industrial purifying plant with
slime processing will reduce total cooling water consumption on indirect and
direct system to minimal possible quantities, only related to supplementing fresh
water into closed system that arise from internal losses and herewith enable to
the customer:
- transition from open to closed cooling system for rolling mill
frameworks Blooming and Steckel
- purification and cooling of water (capacity of the indirect system amounts
to150 m³/h, direct system capacity amounts to 1236 m³/h)
- reduction of cooling water consumption to only 2% of prior
quantity due to closing of cooling circuits
- environment protecting effects – reducing environmental burdens
of emissions
- financial savings at economic taxes
- readiness of all waste slime for further sale or possible
filling into EOP.
- central control system
- compliant to Slovenian and BREF legislation.
In February 2008, we also successfully
concluded 30-day cycle of testing, tuning and monitoring operation in real
conditions under full loading.
|