Silver national award for an innovative project
»Waste Water Treatment System in the Nikola Tesla A Thermoelectric Power Plant, Obrenovac«
Silver national award for an innovative project Waste Water Treatment System in the Nikola Tesla A Thermoelectric Power Plant, Obrenovac

 

Customer list

ImageEnvironmental projects references[Image316kB ]

MUNICIPAL AND INDUSTRIAL WASTE WATER TREATMENT PLANTS

InvestorLocationProjectYear
STEKLARNA ROGAŠKARogaška SlatinaIndustrial Waste Water Treatment Plant for waste water from glass cutting workshop1993
GEOPROJEKT LJUBLJANAGaberkeGaberke pumping station1998
VODOVOD KANALIZACIJA LJUBLJANALjubljanaReconstruction of electrical equipment at sewage pumping stations2000
NIKOŽeleznikiIndustrial Waste Water Treatment Plant for waste water from galvanization process2001
ACRONIJeseniceIndustrial Waste Water Treatment Plant2002
ELEKTROSIGNALCeljeElectrical installations at the Celje municipal waste water treatment plant2002
PREMOGOVNIK VELENJEVelenjeElaboration of a study for Industrial Waste Water Treatment Technology2002
OBČINA ŠMARTNO OB PAKIŠmartno ob PakiMunicipal Waste Water Treatment Plant -4.500 EI, I. phase2002-2003
ZAVOD PROJEKT ATOLLjubljanaSmall Waste Water Treatment Plant for research station Makrolab2003
VODOVOD KANALIZACIJA LJUBLJANALjubljanaWaste water pumping station - modernization of the electrical equipment2003-2004
KOMUNALNO PODJETJE VELENJEVelenjePilot Device for Sludge stabilization2004
COMETZrečeStudy for Waste Water Treatment2005
ACRONIJeseniceReduction of cooling water consumption -cleaning2004-2005
JAVOR PIVKAPivkaIndustrial Waste Water Treatment Plant2005-2006
ACRONIJeseniceTreatment of neutralisation sludge2005-2006
ACRONIJeseniceWaste water neutralisation from lixivium lines2005-2006
METAL RAVNERavne na KoroškemIndustrial Waste Water Treatment Plant2006
ACRONIJeseniceIndustrial Waste Water Treatment Plant2006-2007
DROGA KOLINSKARogaška SlatinaIndustrial Waste Water Treatment Plant2006-2007
ACRONIJeseniceSludge treatment2007
ACRONIJeseniceExecuting of construction works, supply and installation on project "Cooling water supply"2008-2009
ELEKTROPRIVREDA REPUBLIKE SRBSKEUgljevik, BIHReconstruction of waste water system in the TE and mine Ugljevik including municipal waste water treatment plant (450, 750,1500 PE)2010-2012
KOMUNALNO PODJETJEVelenjeAnnual electrical manintenance on the water treatment plant2011
OBČINA DOMŽALE, KAMNIK, MENGEŠDomžaleCentral Waste water treatment plant Domžale-Kamnik, maintenance work2011
OBČINA MOZIRJEMozirjeImplementation works on the treatment plant PE 60002015-2016
OBČINA JESENICEJeseniceSewer construction works, reconstruction and upgrade of central waste water treatment plant at municipality Jesenice- construction of tertiary Jesenice 30000 PE2013-2015
OBČINA ILIRSKA BISTRICAIlirska BistricaReceiving a cesspool of sewage - Technology2014
OBČINA ŠMARJE PRI JELŠAHŠmarje pri JelšahSewage treatment plant Mestinje 1950 PE2014 - 2015
DELEGATION OF THE EUROPEAN UNION TO THE REPUBLIC OF SERBIAObrenovac, SRBEU - Construcion and commissioning of the new WWTP at TPP Nikola Tesla A2014 - 2016
ELECTRIC POWER INDUSTRY OF SERBIAObrenovac, SRBConstruction of oily waste water treatment plant at TENT A2016-2017
HENKEL MARIBORMariborNew pretreatment Inudustrial Waste Water Treatment Plant2016-2017
KOMUNALA NOVO MESTODolenjske ToplicePilot Tests, optimization WWTP2017
TE PLOMINPlomin, HRVReconstruction of the lamella clarifier2017
ELEKTROPRIVREDA REPUBLIKE SRPSKEUgljevik, BIHProcurement of services of maintenance (repair) and improvement of the industrial WTP (Ugljevik)2017
VO-KA CELJEŠkofja vasWastewater treatment plant Škofja vas - reconstruction of mechanical pre-treatment2017-2018
KOMUNALA TOLMINTolminReconstruction of WWTP Volče2017-2018
UTILITIY COMPANY ZHYTOMYRVODOKANALZhytomyr, UKRReconstruction of WWTP Zhytomyr, Including Replacement Of Mechanical And Electrical Equipment And Sewer Pipes2018-2021
OBČINA DOLENJSKE TOPLICEDolenjske TopliceMunicipal waste water treatment plant2018-2019
HENKEL MARIBORMariborAutomatic dosing of lime suspension in industrial waste water treatment plant Henkel2019
VARKOM VARAŽDINVaraždin, HRVConstruction of wastewater treatment plant Varaždinske toplice2019-2022
JP ELEKTROPRIVREDA SRBIJEBeograd, SRBAnnual maintenance of the TENT-A wastewater management system2019
OBČINA MOZIRJEMozirjeWastewater treatment plant Mozirje - Phase 2, digester2021
PRIMOŠTEN ODVODNJAPrimošten, HRVConstruction of the drainage and wastewater treatment system of the settlement of Primošten - Phase I A - WWTP Primošten 18.750 PE2020-2022
KOMRAD SLATINASlatina, HRVConstruction of WWTP for agglomeration Slatina (FIDIC Yellow) and access infrastructure 16.000 PE2020-2023

WATER CONDITIONING

InvestorLocationProjectYear
TERMOELEKTRARNA BRESTANICABrestanicaChemical Process Water Conditioning Facility1999-2000
MELAMINKočevjeClosed cooling system2001
CINKARNA CELJECeljeProcess Water Conditioning Facility2002
CINKARNA CELJECeljeReconstruction of a cooling tower EWB 7200/092002
GORENJEVelenjeTransport and storage of PUR components2000-2001
TERMOELEKTRARNA ŠOŠTANJŠoštanjReconstruction of Chemical Process Water Conditioning Facility2002
ACRONIJeseniceReduction of cooling water consumption -chemical and termical preparation2004-2005
TERMOELEKTRARNA ŠOŠTANJŠoštanjSystem for preparation and dosage of lime milk2004
CINKARNA CELJECeljeWater treatment2005-2006
ENERGETIKA MARIBORMariborWater treatment2008
JAVNO PODJETJE TOLOTNA OSKRBAMariborReconstruction works of chemical water treatment plant2008-.2009
VODOVOD – KANALIZACIJAFrankolovoReplacement facility for drinking water production, Waterworks Frankolovo2010
TERMOELEKTRARNA ŠOŠTANJŠoštanjWater treatment2012-2015
TERMOELEKTRARNA ŠOŠTANJŠoštanjAmmonia water - unit 62012-2015
DRAVSKE ELEKTRARNE MARIBORMariborski otokReconstruction of technological sanitary plumbing on HE MO2014
TERMOELEKTRARNA ŠOŠTANJŠoštanjAmmonia water - unit 62012-2015
PETROL ENERGETIKAŠtoreReconstruction on the SIIla pumping station2017

PREPARING DRINKING WATER

InvestorLocationProjectYear
VODOVOD – KANALIZACIJAFrankolovoReplacement facility for drinking water production, Waterworks Frankolovo2010
MESTNA OBČINA VELENJEVelenjeComplete drinking water supply in Šaleška valley2012-2015
OBČINA MAKOLEMakoleDrinking water supply in the basin of river Savinja, Set 32013-2015
OBČINA GRADPomurjeDrinking water supply in Pomurje region,system B -Set 32013-2014
OBČINA ŠENTJURŠentjurDrinking water supply in the basin of river Sotla and implementation of drinking water pipeline in the Šentjur municipality2014-2015
INFRAKrškoThe pumping station in the area of the old part of Krk on Dalmatinova street2014-2015
OBČINA LJUTOMERLjutomerDrinking water supply in Pomurje - System C - Lot 22014-2015
MESTNA OBČINA VELENJEVinska goraWater Supply System Vinska Gora – section 5 and 82015
MESTNA OBČINA NOVO MESTONovo mestoConstruction of Water treatment Plant, Hydraulic improvement of potable water supply system in central Dolenjska2015-2016
OBČINA KANAL OB SOČIDeskleFacilities for drinking water preparation Deskle2016
KOMRAD HrvaškaVo?in - Sobunar, HRVFacilities for drinking water production - water pumping station "Vo?in - Sobunar"2016-2018
OBČINA KANAL OB SOČIAvčeWater filtration Avče2017
OBČINA KANAL OB SOČILožiceFacilities for drinking water preparation Ložice2017
OBČINA KANAL OB SOČIRočinjFacilities for drinking water preparation Ročinj2018
MUNICIPALITY OF NEVESINJENevesinje, BIHRehabilitation of Alagovac Water Treatment Plant, Nevesinje2018-2021
OBČINA KANAL OB SOČIKambreškoFacilities for drinking water preparation Kambreško2019
MINISTERSTVO ZA ZEMLJODELSTVO, ŠUMARSTVO I VODOSTOPANSTVORepublika Severna Makedonija, MKDCivil works on water treatment plant Karbinci2020-2021
OP?INA ORAŠJEOrašje, BIHDesign and construction of water treatment plant Orašje2020-2021
KOLEKTOR SISTEHRepublika Severna Makedonija, MKDSupply of equipment for WTP Štip2020
KOMUNALA NOVO MESTONovo mestoService and equipment to ensure the safe and uninterrupted operation of the Jezero and Stopiče WTPs2020

FLUE GAS DESULPHURIZATION

InvestorLocationProjectYear
TERMOELEKTRARNA ŠOŠTANJŠoštanjAdditive desulphurization of flue gases at all of the five units1991-1994
TERMOELEKTRARNA ŠOŠTANJŠoštanjElectrical and mechanical equipment at the desulphurization plant for the unit No. 41993-1995
TERMOELEKTRARNA ŠOŠTANJŠoštanjDump for the flue gas desulphurization by-products1994
TERMOELEKTRARNA ŠOŠTANJŠoštanjPumping station for moistening by-products, desulphurization at the by-product dump1994
TERMOELEKTRARNA ŠOŠTANJŠoštanjPower supply for stack emmision measuring equipment at the unit 4 and 5 stacks1994
TERMOELEKTRARNA ŠOŠTANJŠoštanjMaintenance of mechanical equipment for flue gas desulphurization at unit no. 41995
TERMOELEKTRARNA ŠOŠTANJŠoštanjRefit of the flue gas desulphurization plant for unit 4; replacement of the spraying pipelines; instalation of sieves on the suction side of the existing pumps1996-1998
TERMOELEKTRARNA ŠOŠTANJŠoštanjFlue gas desulphurization plant for unit 51999-2000
MPI RECIKLAŽAŽerjavDesulphurization of flue gases from metalurgical treatment of secondary lead1998-2000
TERMOELEKTRARNA TRBOVLJETrbovljeFlue gas desulphurisation - Basic design2001
MPI RECIKLAŽAŽerjavReconstruction of the desulphurization plant2005-2006
TERMOELEKTRARNA TRBOVLJETrbovljeFlue gas desulphurisation - Project for building permit2005
ELEKTROPRIVREDA BIHTuzla, BIHFlue gas desulphurisation - Basic design2004-2005
MPI RECIKLAŽAŽerjavFlue gas desulphurisation- renovation system2009
TERMOELEKTRARNA ŠOŠTANJŠoštanjFlue gas desulphurisation- Unit 62009
MPI RECIKLAŽAŽerjavUpdated process flue gas from the frunace drum2009
MPI RECIKLAŽAŽerjavProcess update of the flue gases from drum furnace. Reconstruction works between drum furarnaces and bag filter2009
TERMOELEKTRARNA ŠOŠTANJŠoštanjFlue gas duct recovery, recirculation of fue gases and fresh air - TPP Šoštanj2011
TERMOELEKTRARNA ŠOŠTANJŠoštanjFlue gas duct recovery2013
TERMOELEKTRARNA ŠOŠTANJŠoštanjDesigning, manufacturing and implementation of flue gas desulphurisation device at unit 6 (power 600 MW TPP Šoštanj)2011-2015
TERMOELEKTRARNA ŠOŠTANJŠoštanjOverhaul works on FGD Unit 62018
TERMOELEKTRARNA ŠOŠTANJŠoštanjMaintanance work on FGD Unit 62020

THERMAL PROCESSING OF WASTES

InvestorLocationProjectYear
ESOTECH & INSTITUT JOŽEF STEFANPodgorica pri LjubljaniDemonstration facility for thermic waste treatment2000-2002
VIPAP VIDEM KRŠKOKrškoIncineration on boiler K5 - Basic design2000
ADRIA MOBILNovo MestoTest incineration of waste in a pilot facility for thermic waste treatment2002
MPI RECIKLAŽAŽerjavTest incineration of waste in a pilot facility for thermic waste treatment2005
PALOMASladki VrhPaper industry - waste processing2006
KOTOLjubljanaDesigning and implementation of technological equipment for biogas power station2007-2008
JAVNA AGENCIJA ZA TEHNOLOŠKI RAZVOJ RSLjubljanaTechnology development for biogas production from communal waste and industry waste2009
KOTOLjubljanaUpgrade of biogas power station KOTO2010

DUST REMOVAL - ASPIRATION

InvestorLocationProjectYear
LIVARNABerlin, DEUFoundry - dust removal system1987
LESNASlovenj GradecFlue gas filtration2000
KOTOLjubljanaMechanical and electrical installations for ventilation2002-2006
ACRONIJeseniceReconstruction of a dust removal installation EOP - phase 12002
ACRONIJeseniceRevamping of drying and heation points2003
ACRONIJeseniceReconstruction and construction works on mod-ernization of VOD device2004
ACRONIJeseniceSupply and erection works, mechanical and electrical for expansion of cooling system of VOD 1 device2004
ŠTORE STEELŠtoreModernizaton of heating points2006
LUKA KOPERKoperReconstruction of wagon station for bulk cargo - dust removal2006
W&P PROFILRušeEquipment installation for crusginh and sieving silicon alloys2007 - 2008
TERMOELEKTRARNA ŠOŠTANJŠoštanjManufacturing and equipment installation for recirculation on unit 5 (TPP Šoštanj)2007
MPI-RECIKLAŽAŽerjavFlue gas ducts from bag filter to flue gas fan in RDP device2010
ACRONIJeseniceManufacture of the ventilation system2011
ACRONIJeseniceAOD converter2016-2017

TRANSPORT EQUIPMENT

InvestorLocationProjectYear
LUKA KOPERKoperBulk cargo, dry bulk cargo, Belinka borates unloading terminal and dry bulk cargo loading terminal1985-1995
LUKA KOPERKoperAutomation of technological drives in the extended halls TH1 and TH21986
PREMOGOVNIK VELENJEVelenjeUpgrade of the plant for the operative preparation of the electrostatic precipitator ashes1996-1998
GLIN NAZARJENazarjeConveying and screening equipment1999
PREMOGOVNIK VELENJEVelenjeConveyors - 50 C in 711999
PREMOGOVNIK VELENJEVelenjeReconstruction of connections for the pneumatic transport of EP ashes from unit 5 of the Thermal Power Plant Šoštanj to the silos S 2, S 3 and S 41997-1998
LUKA KOPERKoperMobile transporter with a screening unit, capacity of 300 t/h1999
TOVARNA SLADKORJA ORMOŽOrmožSystem for loading of sugar into road tankers2001
TERMOELEKTRARNA ŠOŠTANJŠoštanjTransport of slag and ash at Unit 52002
TERMOELEKTRARNA ŠOŠTANJŠoštanjSupply of steel conveyor2002-2004
TERMOELEKTRARNA ŠOŠTANJŠoštanjYear refit works on ash transport of unit 4 and 52004
TERMOELEKTRARNA ŠOŠTANJŠoštanjTransport of slag and ash at Unit 42004
TERMOELEKTRARNA TOPLARNA LJUBLJANALjubljanaMoisturing of system for re-pouring on coal transport2005-2006
TERMOELEKTRARNA ŠOŠTANJŠoštanjLink conveyor2005
TERMOELEKTRARNA ŠOŠTANJŠoštanjRubber conveyor for gypsum in mixing station of unit 52005
LUKA KOPERKoperReconstruction of wagon station for bulk cargo2006
TERMOELEKTRARNA ŠOŠTANJŠoštanjMaintanance works on ash transportation unit 5 (TPP Velenje )2006 -2007
TERMOELEKTRARNA TUZLATuzla, BIHReconstruction works on slag transportation for unit 52006 - 2007
TERMOELEKTRARNA ŠOŠTANJŠoštanjSlag transportation on unit 5 for truck loading2008
TE TOLLjubljanaAssembly of electricity equipment for biomass transportation system2008
TERMOELEKTRARNA ŠOŠTANJŠoštanjSlag redirecting to the hydraulic transport2008
ELEKTROPRIVREDA BiHTuzla, BIHReconstruction works on slag transportation for unit 4 (TPP Tuzla)2009
RUDNIK UGLJA A.D. PLJEVLJAPljevlja, MNEReconfiguration and modernization of the DTO system – Phase I.2018
 
environmental policy
standards & certificates
About us
Esotech, Joint stock company
Company for Development and Implementation of Environmental Solutions and Power Technologies

Preloška cesta 1
3320 Velenje
Slovenia
EU

Telephone: +386 3 8994 500
Telefax: +386 3 8994 503
E-mail: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
VAT: 73789933
 more...

ISOCert

© 2024 Esotech, d.d.
All rights reserved.