Construction of a new cooling tower and design of a new industrial wastewater treatment plant |
August 2023:
ESOTECH has recently signed two contracts with a strategically important customer, SIJ Metal Ravne.
The first contract involves the construction of a new cooling tower with associated infrastructure, for which ESOTECH has also prepared the project documentation.
The second project involves the design of a new industrial wastewater treatment plant that will help improve the management of wastewater and discharges, thereby increasing the environmental sustainability of their production.
The signing of the contracts represents a strengthening of business ties between ESOTECH and SIJ Metal Ravne and paves the way for further cooperation in the future.
|