Renovation of secondary systems on Dravograd, Vuzenica in Mariborski otok hydropower plants – LOT OPR |
May 2022:
At the end of April 2021, the lead partner Esotech, d.d., together with his partner C&G d.o.o., signed a contract with the client Dravske elektrarne Maribor d.o.o. , for the renovation of secondary systems on Dravograd, Vuzenica in Mariborski otok hydropower plants – LOT OPR.
Scope of works includes the supply of medium voltage equipment, self-consumption equipment of alternating and direct voltage, control and protection equipment and excitation system for HPP Mariborski otok, Vuzenica and Dravograd and diesel electric generator for HPP Dravograd. In addition to the supply, the scope also includes the preparation of documentation and participation in the commissioning of a new control and protection system and commissioning of own consumption equipment, excitation system, switching automation of own consumption sources and diesel generator and installation of diesel generator at HPP Dravograd. The contractual deadline for the execution of works is 30.9.2025.
|