Esotech, d.d.

news arrow news arrow Supply and assembly of protection, control and measurement equipment for DTS 110/20 kV ORMOŽ
news
about esotech
environmental solutions
power technologies
construction
references

Team

Silver national award for an innovative project
»Waste Water Treatment System in the Nikola Tesla A Thermoelectric Power Plant, Obrenovac«
Silver national award for an innovative project Waste Water Treatment System in the Nikola Tesla A Thermoelectric Power Plant, Obrenovac

 

Supply and assembly of protection, control and measurement equipment for DTS 110/20 kV ORMOŽ
Supply and assembly of protection, control and measurement equipment for DTS 110/20 kV ORMOŽ

March 2022:

At the end of March 2022, Esotech, d.d. signed a contract with the employer, Elektro Maribor d.d., for the supply and assembly of protection, control and measurement equipment for DTS 110/20 kV Ormož.

The contract scope of work includes protection and control of 110 kV part, protection and control of MV switchyard, protection and control of MV neutral point, equipment at the station level, system of measurement and quality of electricity and distribution system for own use. The deadline for the execution of works is 31.05.2023.

 
< Prev   Next >
environmental policy
standards & certificates
About us
Esotech, Joint stock company
Company for Development and Implementation of Environmental Solutions and Power Technologies

Preloška cesta 1
3320 Velenje
Slovenia
EU

Telephone: +386 3 8994 500
Telefax: +386 3 8994 503
E-mail: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
VAT: 73789933
 more...

ISOCert

© 2024 Esotech, d.d.
All rights reserved.