DTS 400/220/110 kV Beri?evo - supply of secondary equipment, manufacture and installation of secondary equipment cabinets and electrical installation works |
June 2020:
In June 2020 we signed a contract, with employer ELES, d.o.o. for the supply of secondary equipment, supply, manufacture and installation of cabinets for secondary equipment and the implementation of electrical installation works in the distribution transformer station (DTS) Beri?evo.
The Beri?evo substation with the highest voltage level of 400 kV serves as: (1) a hub for the transmission of electricity in international transmissions of electrical energy from east to west; (2) node in the transmission of el. energy between Slovenian regions; (3) the most important supply point for the Ljubljana consumer area with its wider surroundings.
Project activities are already underway; in accordance with the contractual schedule, the project will be completed in 2023.
|