Transformer station TS11 - Rondelice |
August 2018:
Investor Talum wanted to modernize its energy network and provide reliable electricity supply and therefore decided to modernize the transformer station TS11 - Rondelice. Together with our contractual partner C & G, we successfully acquired a project for the Transformation Station TS11 Rondelice 10 / 0,4 kV Transmission Station.
Our contractual obligations consisted of:
- new 10 kV switchgear ZPUE RELF12 equipped with ABB appropriate equipment and protection relays ABB protection REF615,
- medium voltage cable connections,
- control and signal connections,
- functional tests and start-up,
- links to the existing Central Control System
The complete equipment was designed to be connected to the existing central control system, which was designed for the needs of controlling the Talum power system. In addition to field work our contractual obligation the project documentation for the MV switching block.
We have designed the project documentation for the MV switching block. Now all functional tests are carried out in the transformer station itself, as well as in connection with the Talum power system. At the end of the month, an inspection by an energy inspector is foreseen. The transformer station TS11 Rondelice will be ready for a technical inspection and trial operation.
|